NPDES MTR107111 · Clean Water Act

BLOOMSTONE DEVELOPMENT, Kalispell, MT: NPDES MTR107111 discharge permit, effluent exceedances, inspections, penalties

BLOOMSTONE DEVELOPMENT, Kalispell, Montana: General permit coverage MTR107111, held by KALISPELL NATIONAL INVESTMENT CO LLC; Construction stormwater; Administratively continued; issued November 17, 2017, term to December 31, 2017, by MT DEQ; discharges to Stillwater.

  • April 12, 2018: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • April 12, 2018: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • April 12, 2018: WW Storm Water Construction - Failure to Maintain Records (ST6).
  • April 12, 2018: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
  • April 12, 2018: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,224 were issued before MTR107111.

Coverages issued nearest MTR107111

BLOOMSTONE DEVELOPMENT among its neighbors

60 discharge permits are in the Stillwater River-Beaver Creek subwatershed (HUC 170102100403); MTR107111 is one. Its county: 336, 3 major; MTR107111 is minor permit.

Other permits in the Stillwater River-Beaver Creek subwatershed (HUC 170102100403)

What stands out

  • Its term runs 44 days, November 17, 2017 to December 31, 2017; the term ended 3,180 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on April 12, 2018, 3,078 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 5 events for it, all in 2018.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBLOOMSTONE DEVELOPMENT
PermitteeKALISPELL NATIONAL INVESTMENT CO LLC
NPDES IDMTR107111
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 17, 2017
ExpiresDecember 31, 2017
AgencyMT DEQ
AddressKalispell, MT 59901
Receiving waterStillwater
SubwatershedStillwater River-Beaver Creek (HUC 170102100403)

NPDES MTR107111: effluent limits and exceedances

BLOOMSTONE DEVELOPMENT (NPDES MTR107111): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR107111: no pollutant row on file.

NPDES MTR107111: inspections, violations and enforcement

NPDES MTR107111: 5 single-event violations

DateWhat EPA recordedAgency
April 12, 2018WW Storm Water Construction - Failure to properly install/implement BMPsST6
April 12, 2018WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
April 12, 2018WW Storm Water Construction - Failure to Maintain RecordsST6
April 12, 2018WW Storm Water Construction - Failure to Conduct InspectionsST6
April 12, 2018WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6

NPDES MTR107111 (BLOOMSTONE DEVELOPMENT): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR107111

NPDES MTR107111: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR107111

NPDES MTR107111: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.