US 12 BANK STABILIZATION PHASE 2, Roundup, MT: NPDES MTR108772 discharge permit, effluent exceedances, inspections, penalties
US 12 BANK STABILIZATION PHASE 2, Roundup, Montana: General permit coverage MTR108772, held by Montana Department of Transportation; Construction stormwater; Effective; issued February 16, 2021, term to December 31, 2022; discharges to MUSSELSHELL RIVER.
- May 11, 2021: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- May 11, 2021: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- May 11, 2021: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,384 were issued before MTR108772. Montana Department of Transportation holds 67 permits in Montana.
Other permits held by Montana Department of Transportation
- MDT - MS4 STATEWIDE, Helena: MT0031844
- HUSON - EAST, Frenchtown: MTR107134, issued 2018-01-12
- RARUS/SILVER BOW CREEK STRUCTURES, Butte: MTR107185, issued 2018-03-13
- ZIMMERMAN TRAIL, Billings: MTR107360, issued 2018-06-26
- BAINVILLE SOUTH S327 FROM JCT W HWY #2 TO ND BORDER, Bainville: MTR107624, issued 2018-11-15
- TOSTON STRUCTURES, Toston: MTR107728, issued 2019-03-14
- JCT MT 217 SOUTH, GALATA, Galata: MTR107896, issued 2019-06-03
- 27TH STREET - 1ST AVE S TO AIRPORT, Billings: MTR107935, issued 2019-06-17
- BAD ROUTE INTERCHANGE - NE, Fallon: MTR108054, issued 2019-08-16
- LOHMAN - E & W, Chinook: MTR108138, issued 2019-11-01
Coverages issued nearest MTR108772
- 2021-02-01: TRINITY APARTMENTS - MULLAN SITE, Missoula: MTR108727, held by HEADWATERS CONSTRUCTION CO
- 2021-02-03: BRIDGER CANYON RESIDENCE, Bozeman: MTR108762, held by Brodey Simkins
- 2021-02-04: FOUR POINTS SUBDIVISION- PH. II, Bozeman: MTR108769, held by Four Points Village II LLC
- 2021-02-08: 9772000: EAST OF BUSBY - EAST, Busby: MTR10I036, held by Montana Department of Transportation
- 2021-02-08: EAST OF BUSBY - EAST, Busby: MTR10I037, held by Riverside Contracting, Inc.
- 2021-02-18: HIGHWAY 12 - SHOULDER WIDENING, Helena: MTR108777, held by Montana Department of Transportation
- 2021-02-26: FORT PECK WEST MAINLINE SCHEDULE 4 - PUMP STATIONS AND GROUND STORAGE RESERVOIRS, Fort Peck Reservation: MTR10I038, held by Knife River Yellowstone Division
- 2021-03-04: US 12 CULVERTS - EAST OF MILES CITY, Miles City: MTR108724, held by Montana Department of Transportation
- 2021-03-10: O'KEEFE RANCH ESTATES SUBDIVISION, Missoula: MTR108258, held by Ryan Built Homes LLC
- 2021-03-10: POWDERLIGHT SUBDIVISION LOT 3 & 4, Big Sky: MTR108788, held by CrossHarbor Capital Partners
US 12 BANK STABILIZATION PHASE 2 among its neighbors
1 discharge permits are in the Musselshell River-Stag Run subwatershed (HUC 100402012307); MTR108772 is one. Its county: 22, 0 major; MTR108772 is minor permit.
What stands out
- Its term runs 1 year and 318 days, February 16, 2021 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on May 11, 2021, 1,953 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 3 events for it, all in 2021.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | US 12 BANK STABILIZATION PHASE 2 |
|---|---|
| Permittee | Montana Department of Transportation |
| NPDES ID | MTR108772 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 16, 2021 |
| Expires | December 31, 2022 |
| Address | Roundup, MT 59072 |
| Receiving water | MUSSELSHELL RIVER |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Musselshell River-Stag Run (HUC 100402012307) |
NPDES MTR108772: effluent limits and exceedances
US 12 BANK STABILIZATION PHASE 2 (NPDES MTR108772): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR108772: no pollutant row on file.
NPDES MTR108772: inspections, violations and enforcement
NPDES MTR108772: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| May 11, 2021 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| May 11, 2021 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| May 11, 2021 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
NPDES MTR108772 (US 12 BANK STABILIZATION PHASE 2): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR108772
NPDES MTR108772: one email when its EPA record changes — $99/month.
Permits near NPDES MTR108772
NPDES MTR108772: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.