NPDES MTR108772 · Clean Water Act

US 12 BANK STABILIZATION PHASE 2, Roundup, MT: NPDES MTR108772 discharge permit, effluent exceedances, inspections, penalties

US 12 BANK STABILIZATION PHASE 2, Roundup, Montana: General permit coverage MTR108772, held by Montana Department of Transportation; Construction stormwater; Effective; issued February 16, 2021, term to December 31, 2022; discharges to MUSSELSHELL RIVER.

  • May 11, 2021: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • May 11, 2021: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • May 11, 2021: WW Storm Water Construction - Failure to Conduct Inspections (ST6).

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,384 were issued before MTR108772. Montana Department of Transportation holds 67 permits in Montana.

Other permits held by Montana Department of Transportation

Coverages issued nearest MTR108772

US 12 BANK STABILIZATION PHASE 2 among its neighbors

1 discharge permits are in the Musselshell River-Stag Run subwatershed (HUC 100402012307); MTR108772 is one. Its county: 22, 0 major; MTR108772 is minor permit.

What stands out

  • Its term runs 1 year and 318 days, February 16, 2021 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on May 11, 2021, 1,953 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 3 events for it, all in 2021.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityUS 12 BANK STABILIZATION PHASE 2
PermitteeMontana Department of Transportation
NPDES IDMTR108772
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedFebruary 16, 2021
ExpiresDecember 31, 2022
AddressRoundup, MT 59072
Receiving waterMUSSELSHELL RIVER
Receiving water impaired303(D) Listed
SubwatershedMusselshell River-Stag Run (HUC 100402012307)

NPDES MTR108772: effluent limits and exceedances

US 12 BANK STABILIZATION PHASE 2 (NPDES MTR108772): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR108772: no pollutant row on file.

NPDES MTR108772: inspections, violations and enforcement

NPDES MTR108772: 3 single-event violations

DateWhat EPA recordedAgency
May 11, 2021WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
May 11, 2021WW Storm Water Construction - Failure to properly install/implement BMPsST6
May 11, 2021WW Storm Water Construction - Failure to Conduct InspectionsST6

NPDES MTR108772 (US 12 BANK STABILIZATION PHASE 2): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR108772

NPDES MTR108772: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR108772

NPDES MTR108772: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.