HERON CREEK SUBDIVISION, Helena, MT: NPDES MTR108860 discharge permit, effluent exceedances, inspections, penalties
HERON CREEK SUBDIVISION, Helena, Montana: General permit coverage MTR108860, held by Sussex Construction, Inc; Construction stormwater; Effective; issued April 2, 2021, term to December 31, 2022; discharges to SPOKANE CREEK.
- August 17, 2022: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- August 17, 2022: WW Storm Water Construction - CWA §308 Failure to submit required permit application information (ST6).
- August 17, 2022: WW Storm Water Construction - Failure to apply for a notice of termination (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,400 were issued before MTR108860. Sussex Construction, Inc holds 2 permits in Montana.
Other permits held by Sussex Construction, Inc
- WESTSIDE WOODS SUBDIVISION, Helena: MTR110143, issued 2023-04-24
Coverages issued nearest MTR108860
- 2021-03-26: NORTHWEST CROSSING SUBDIVISION PHASE 1, Bozeman: MTR108838, held by NWX LLC
- 2021-03-30: MCCONE COUNTY STOCKPILE/PUG MILL, Brockway: MTR108830, held by PRINCE INC
- 2021-03-31: WISDOM - WEST / TRAIL CREEK STRUCTURES, Wisdom: MTR108846, held by Montana Department of Transportation
- 2021-04-02: CLEARWATER WIND PROJECT, Angela: MTR108845, held by Clearwater Energy Resources LLC
- 2021-04-02: TWIN BRIDGES ROAD - BRIDGE REMOVAL MDT EX121, Reed Point: MTR108848, held by Montana Department of Transportation
- 2021-04-05: LOCKWOOD WATER TREATMENT PLANT, Billings: MTR108852, held by Record Steel and Construction, Inc.
- 2021-04-07: PALISADES APARTMENTS, Bozeman: MTR108798, held by Roller Construction Inc.
- 2021-04-07: MONARCH TO KING'S HILL TRANSMISSION LINE REBUILD, Monarch: MTR108810, held by NORTHWESTERN ENERGY
- 2021-04-08: GRANT CREEK CROSSING MINI STORAGE, Missoula: MTR108868, held by KNIFE RIVER MISSOULA
- 2021-04-09: COLLINS APARTMENTS, Bozeman: MTR108614, held by Springer Group
HERON CREEK SUBDIVISION among its neighbors
7 discharge permits are in the Lower Spokane Creek subwatershed (HUC 100301011603); MTR108860 is one. Its county: 238, 2 major; MTR108860 is minor permit.
Other permits in the Lower Spokane Creek subwatershed (HUC 100301011603)
- HELENA CHRISTIAN SCHOOL NEW BUILDING, East Helena: MTR111571, minor, term to 2027-12-31
- HERON CREEK SUBDIVISION, Helena: MTX000210, minor, term to 2019-11-30
- KAMP MINOR SUBDIVISIONS TRACT A-1 AND TRACT B-1, East Helena: MTR106817, minor, term to 2017-12-31
- KENNETH DIEHL MUD SPRINGS MAJOR SUBDIVISION, Helena: MTR102550, minor, term to 2007-12-31
- MONTANA DEPT OF TRANSPORTATION JCT S-284 - WEST, Helena: MTR103538, minor, term to 2011-12-31
- PALEO SEARCH INC - SUCTION DREDGE PROJECT, Helena: MT0025020, major, term to 2014-10-31
What stands out
- Its term runs 1 year and 273 days, April 2, 2021 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on August 17, 2022, 1,490 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 3 events for it, all in 2022.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HERON CREEK SUBDIVISION |
|---|---|
| Permittee | Sussex Construction, Inc |
| NPDES ID | MTR108860 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 2, 2021 |
| Expires | December 31, 2022 |
| Address | Helena, MT 59602 |
| Receiving water | SPOKANE CREEK |
| Subwatershed | Lower Spokane Creek (HUC 100301011603) |
NPDES MTR108860: effluent limits and exceedances
HERON CREEK SUBDIVISION (NPDES MTR108860): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR108860: no pollutant row on file.
NPDES MTR108860: inspections, violations and enforcement
NPDES MTR108860: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| August 17, 2022 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| August 17, 2022 | WW Storm Water Construction - CWA §308 Failure to submit required permit application information | ST6 |
| August 17, 2022 | WW Storm Water Construction - Failure to apply for a notice of termination | ST6 |
NPDES MTR108860 (HERON CREEK SUBDIVISION): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR108860
NPDES MTR108860: one email when its EPA record changes — $99/month.
Permits near NPDES MTR108860
NPDES MTR108860: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.