NPDES MTR109101 · Clean Water Act

BELT N&S - PHASE 3, Belt, MT: NPDES MTR109101 discharge permit, effluent exceedances, inspections, penalties

BELT N&S - PHASE 3, Belt, Montana: General permit coverage MTR109101, held by RIVERSIDE CONTRACTING INC; Construction stormwater; Effective; issued August 10, 2021, term to December 31, 2022; discharges to BELT CREEK.

  • October 19, 2022: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • October 19, 2022: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • May 11, 2022: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • May 11, 2022: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
  • May 11, 2022: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,467 were issued before MTR109101. RIVERSIDE CONTRACTING INC holds 33 permits in Montana.

Other permits held by RIVERSIDE CONTRACTING INC

Coverages issued nearest MTR109101

BELT N&S - PHASE 3 among its neighbors

8 discharge permits are in the Belt Creek-Belt subwatershed (HUC 100301050401); MTR109101 is one. Its county: 220, 1 major; MTR109101 is minor permit.

Other permits in the Belt Creek-Belt subwatershed (HUC 100301050401)

What stands out

  • Its term runs 1 year and 143 days, August 10, 2021 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on October 19, 2022, 1,427 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 5 events for it, all in 2022.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBELT N&S - PHASE 3
PermitteeRIVERSIDE CONTRACTING INC
NPDES IDMTR109101
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 10, 2021
ExpiresDecember 31, 2022
AddressBelt, MT 59412
Receiving waterBELT CREEK
Receiving water impaired303(D) Listed
SubwatershedBelt Creek-Belt (HUC 100301050401)

NPDES MTR109101: effluent limits and exceedances

BELT N&S - PHASE 3 (NPDES MTR109101): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR109101: no pollutant row on file.

NPDES MTR109101: inspections, violations and enforcement

NPDES MTR109101: 5 single-event violations

DateWhat EPA recordedAgency
October 19, 2022WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
October 19, 2022WW Storm Water Construction - Failure to properly install/implement BMPsST6
May 11, 2022WW Storm Water Construction - Failure to properly install/implement BMPsST6
May 11, 2022WW Storm Water Construction - Failure to Implement SWPPP/SWMPST6
May 11, 2022WW Storm Water Construction - Failure to properly operate and maintain BMPsST6

NPDES MTR109101 (BELT N&S - PHASE 3): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR109101

NPDES MTR109101: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR109101

NPDES MTR109101: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.