NPDES MTR109116 · Clean Water Act
PINE RIDGE RECLAMATION, Big Sky, MT: NPDES MTR109116 discharge permit, effluent exceedances, inspections, penalties
PINE RIDGE RECLAMATION, Big Sky, Montana: General permit coverage MTR109116, held by YELLOWSTONE DEVELOPMENT LLC; Construction stormwater; Effective; issued September 3, 2021, term to December 31, 2022; discharges to SOUTH FORK WEST FORK GALLATIN RIVER.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,488 were issued before MTR109116. YELLOWSTONE DEVELOPMENT LLC holds 16 permits in Montana.
Other permits held by YELLOWSTONE DEVELOPMENT LLC
- MOUNTAIN ROAD EXTENSION, Big Sky: MTR100826, issued 2007-05-04
- YMC PHASE 3A/BIG SKY RIDGE, Big Sky: MTR101236, issued 2007-05-04
- YELLOWSTONE MOUNTAIN CLUB PHASE 3, Big Sky: MTR101494, issued 2007-05-04
- LOREN BOUGH YELLOWSTONE MOUNTAIN CLUB SUPERLOT DRIVEWAY, Big Sky: MTR102176, issued 2007-05-04
- YELLOWSTONE DEVELOPMENT LLC - PIONEER MOUNTAIN DEVELOPMENT, Big Sky: MTR102667, issued 2007-06-22
- BIG SPRINGS VILLAGE, Big Sky: MTR104548, issued 2017-07-18
- AMERICAN SPIRIT DEVELOPMENT, Big Sky: MTR105882, issued 2015-01-02
- PIONEER POINT SUBDIVISION YMC, Big Sky: MTR107316, issued 2018-05-22
- EGLISE MOUNTAIN, Big Sky: MTR107831, issued 2019-05-31
- RANCH #5, Big Sky: MTR109172, issued 2021-09-30
Coverages issued nearest MTR109116
- 2021-09-01: GOING TO THE SUN ROAD AND UPPER MCDONALD CREEK BRIDGE; MT PRA GLAC 10(45), West Glacier: MTR109124, held by WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA
- 2021-09-01: BNSF RAILWAY, Havre: MTR109145, held by Double R Inc
- 2021-09-02: MT HIGHWAY 64 - SCHEDULE E, Big Sky: MTR109130, held by KNIFE RIVER BELGRADE
- 2021-09-02: FITZPATRICK FAMILY RESIDENCE, Big Sky: MTR109136, held by LOHSS CONSTRUCTION
- 2021-09-02: ELK HAVEN RANCH POND CONSTRUCTION, Bozeman: MTR109138, held by Tucquan Properties LLC
- 2021-09-08: HORSETAIL ROAD RESIDENCE AND POND, Bozeman: MTR109159, held by VANSICKLE FAMILY HOLDINGS LLC
- 2021-09-09: MULKEY STAGING AREA - RICHLAND CO. NORTH, Sidney: MTR109127, held by Martin Construction, Inc.
- 2021-09-14: THE DOZIER RESIDENCE, Big Sky: MTR109158, held by BIG SKY BUILD INC
- 2021-09-15: TERRY BRAXTON RESIDENCE, Bozeman: MTR109170, held by SBC INC (SCHLAUCH BOTTCHER CONSTRUCTION INC)
- 2021-09-16: LOT 824-A,, AMERICAN SPIRIT SUBDIVISION PHASE 1, YELLOWSTONE MOUNTAIN CLUB, Big Sky: MTR109152, held by MARTEL CONSTRUCTION INC
PINE RIDGE RECLAMATION among its neighbors
125 discharge permits are in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201); MTR109116 is one. Its county: 780, 1 major; MTR109116 is minor permit.
Other permits in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201)
- 14 MILLER LN, Big Sky: MTR111804, minor, term to 2027-12-31
- 16 MILLER LANE, Big Sky: MTR106511, minor, term to 2017-12-31
- 17 FOSSIL RD. LOT 60B ANDESITE, Big Sky: MTR111818, minor, term to 2027-12-31
- 60 STREAMSIDE WAY, Big Sky: MTR111885, minor, term to 2027-12-31
- ADDISON FAMILY RESIDENCE, Big Sky: MTR111226, minor, term to 2027-12-31
- ALPINE CREEK RESTORATION - UNNAMED TRIB TO GALLATIN 318 PERMIT, Big Sky: MTB004208
- AMERICAN SPIRIT DEVELOPMENT, Big Sky: MTR105882, minor, term to 2017-12-31
- AMERICAN SPIRIT PH 1 SUBDIV LOT 806 LOT 815 YMC, Big Sky: MTR105893, minor, term to 2017-12-31
- BIG SKY BUILD - LOT 401 PH 3A YELLOWSTONE MOUNTAIN CLUB, Big Sky: MTR104695, minor, term to 2012-12-31
- BIG SKY BUILD - LOT 605 - RISLEY RESIDENCE, Big Sky: MTR104169, minor, term to 2011-12-31
What stands out
- Its term runs 1 year and 119 days, September 3, 2021 to December 31, 2022; the term ended 1,383 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PINE RIDGE RECLAMATION |
|---|---|
| Permittee | YELLOWSTONE DEVELOPMENT LLC |
| NPDES ID | MTR109116 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 3, 2021 |
| Expires | December 31, 2022 |
| Address | Big Sky, MT 59716 |
| Receiving water | SOUTH FORK WEST FORK GALLATIN RIVER |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | South Fork West Fork Gallatin River (HUC 100200080201) |
| SIC | 1794 – Excavation Work |
NPDES MTR109116: effluent limits and exceedances
PINE RIDGE RECLAMATION (NPDES MTR109116): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR109116: no pollutant row on file.
NPDES MTR109116: inspections, violations and enforcement
NPDES MTR109116 (PINE RIDGE RECLAMATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR109116
NPDES MTR109116: one email when its EPA record changes — $99/month.
Permits near NPDES MTR109116
NPDES MTR109116: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.