ANNIE SUBDIVISION PHASE 4, Bozeman, MT: NPDES MTR109304 discharge permit, effluent exceedances, inspections, penalties
ANNIE SUBDIVISION PHASE 4, Bozeman, Montana: General permit coverage MTR109304, held by Russell Hosner LLC; Construction stormwater; Effective; issued February 10, 2022, term to December 31, 2022; discharges to MIDDLE CREEK DITCH.
- May 13, 2022: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- May 13, 2022: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,556 were issued before MTR109304.
Coverages issued nearest MTR109304
- 2022-01-27: BIG TIMBER – WP FTTH PROJECT 2022, Big Timber: MTR109229, held by TRIANGLE TELEPHONE COOPERATIVE ASSN INC
- 2022-02-01: BRIDGER HEIGHTS PHASE 3 A-D (SNOWGHOST), Belgrade: MTR109240, held by PV WH Bridger Heights LLC
- 2022-02-01: KALISPELL NORTH TOWN CENTER PH 2, Kalispell: MTR109339, held by LHC INC
- 2022-02-10: BOULDER CREEK APARTMENTS, Bozeman: MTR109235, held by ROSA-JOHNSON DEVELOPMENT LLC
- 2022-02-10: CHARLES M RUSSELL REFUGE REPAIRS, MT FWS CMR 61520(1), Zortman: MTR109293, held by WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA
- 2022-02-10: ALBERTSONS 54TH & GRAND, Billings: MTR109321, held by LANGLAS AND ASSOCIATES
- 2022-02-10: WIBAUX CURVE SAFTEY/BEAVER CREEK BRIDGE REPLACEMENT, Wibaux: MTR109341, held by CENTURY COMPANIES INC
- 2022-02-10: STILL RIVER ESTATES SUBDIVISION, Billings: MTR109349, held by Chad Wagenahls owner ACK Holdings Inc
- 2022-02-15: YELLOWSTONE GENERATING STATION PROJECT, Laurel: MTR109330, held by Burns & McDonnell
- 2022-02-16: YELLOWSTONE INDUSTRIAL DEVELOPMENT, Billings: MTR109297, held by Huppert Brothers Construction Inc
ANNIE SUBDIVISION PHASE 4 among its neighbors
125 discharge permits are in the East Gallatin River-Bozeman subwatershed (HUC 100200081301); MTR109304 is one. Its county: 780, 1 major; MTR109304 is minor permit.
Other permits in the East Gallatin River-Bozeman subwatershed (HUC 100200081301)
- 1ST SECURITY BANK- CATTAIL BRANCH, Bozeman: MTR109278, minor, term to 2022-12-31
- 2131 GRAF, Bozeman: MTR109287, minor, term to 2022-12-31
- 2695 TSCHACHE LANE, Bozeman: MTR110414, minor, term to 2027-12-31
- 5 WEST MENDHALL MIXED-USE FACILITY, Bozeman: MTG070782
- 5TH & MAIN RESIDENCES, Bozeman: MTG071267
- ALDER CREEK SUBDIVISION PHASE 5, Bozeman: MTR105523, minor, term to 2017-12-31
- ALPENGLOW APARTMENTS, Bozeman: MTR111908, minor, term to 2027-12-31
- ASHWOOD APARTMENTS, Bozeman: MTG071379
- ATWELL SUITES-BOZEMAN, Bozeman: MTG071445, minor, term to 2030-04-30
- ATWELL SUITES-BOZEMAN, Bozeman: MTR111614, minor, term to 2027-12-31
What stands out
- Its term runs 324 days, February 10, 2022 to December 31, 2022; the term ended 1,383 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on May 13, 2022, 1,615 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 2 events for it, all in 2022.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ANNIE SUBDIVISION PHASE 4 |
|---|---|
| Permittee | Russell Hosner LLC |
| NPDES ID | MTR109304 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 10, 2022 |
| Expires | December 31, 2022 |
| Address | Bozeman, MT 59718 |
| Receiving water | MIDDLE CREEK DITCH |
| Subwatershed | East Gallatin River-Bozeman (HUC 100200081301) |
| SIC | 1522 – Residential Construction |
NPDES MTR109304: effluent limits and exceedances
ANNIE SUBDIVISION PHASE 4 (NPDES MTR109304): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR109304: no pollutant row on file.
NPDES MTR109304: inspections, violations and enforcement
NPDES MTR109304: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| May 13, 2022 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| May 13, 2022 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
NPDES MTR109304 (ANNIE SUBDIVISION PHASE 4): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR109304
NPDES MTR109304: one email when its EPA record changes — $99/month.
Permits near NPDES MTR109304
NPDES MTR109304: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.