Clean Water Act discharge permit · NPDES MTR109332
PENNEL 17 PIPELINE REROUTE, Baker, MT: NPDES MTR109332 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
PENNEL 17 PIPELINE REROUTE, held by Bridger Pipeline LLC, holds NPDES permit MTR109332, which discharges to Lake Baker. EPA’s file records it issued February 16, 2022 and expiring December 31, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for PENNEL 17 PIPELINE REROUTE: its NPDES ID, its permit type and status, its dates, its address in Baker, Montana, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MTR109332.
What stands out
- Its term runs 318 days, February 16, 2022 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | PENNEL 17 PIPELINE REROUTE |
|---|---|
| Permittee as filed | Bridger Pipeline LLC |
| NPDES ID | MTR109332 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | February 16, 2022 |
| Expiration date | December 31, 2022 |
| Address | Baker, MT 59313 |
| Receiving water | LAKE BAKER |
| Subwatershed | Headwaters Sandstone Creek (HUC 101000050501) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES MTR109332.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES MTR109332.
Inspections
EPA’s inspection file holds no inspection for NPDES MTR109332.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES MTR109332.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MTR109332.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MTR109332 there.
PENNEL 17 PIPELINE REROUTE, Baker, Montana: Coverage under a general permit MTR109332, held by Bridger Pipeline LLC; Construction stormwater; Effective; issued February 16, 2022, term to December 31, 2022; discharges to LAKE BAKER.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,563 were issued before MTR109332. Bridger Pipeline LLC holds 4 permits in Montana.
Other permits held by Bridger Pipeline LLC
- SOUTH BEND 16-INCH CRUDE OIL PIPELINE, Wibaux: MTR108229, issued 2020-02-18
- GLENDIVE MT 10 INC CRUDE LINE, Glendive: MTR108934, issued 2021-05-10
- NATE GATHERING, Fairview: MTR111014, issued 2024-10-08
Coverages issued nearest MTR109332
- 2022-02-10: ALBERTSONS 54TH & GRAND, Billings: MTR109321, held by LANGLAS AND ASSOCIATES
- 2022-02-10: WIBAUX CURVE SAFTEY/BEAVER CREEK BRIDGE REPLACEMENT, Wibaux: MTR109341, held by CENTURY COMPANIES INC
- 2022-02-10: STILL RIVER ESTATES SUBDIVISION, Billings: MTR109349, held by Chad Wagenahls owner ACK Holdings Inc
- 2022-02-15: YELLOWSTONE GENERATING STATION PROJECT, Laurel: MTR109330, held by Burns & McDonnell
- 2022-02-16: YELLOWSTONE INDUSTRIAL DEVELOPMENT, Billings: MTR109297, held by Huppert Brothers Construction Inc
- 2022-02-22: CMRWA MUSSELSHELL JUDITH RURAL WATER SYSTEM PHASE 1, Buffalo: MTR109376, held by COP CONSTRUCTION LLC
- 2022-02-23: FRANKLIN BUILDING, Big Sky: MTR109372, held by LANGLAS AND ASSOCIATES
- 2022-03-02: 93 US 2 CULVERTS, Marion: MTR109370, held by Montana Department of Transportation
- 2022-03-03: GRAVEL ROAD TRAINING COURSE, Malmstrom Afb: MTR109365, held by 819 RED HORSE SQUADRON
- 2022-03-03: FAIRFIELD CURVE IMPROVEMENTS, Fairfield: MTR109381, held by HELENA SAND AND GRAVEL INC
PENNEL 17 PIPELINE REROUTE among its neighbors
21 discharge permits are in the Headwaters Sandstone Creek subwatershed (HUC 101000050501); MTR109332 is one. Its county: 56, 0 major; MTR109332 is minor permit.
Other permits in the Headwaters Sandstone Creek subwatershed (HUC 101000050501)
- 2020 BAKER STORAGE WELL ABANDONMENT PROJECT, Baker: MTR108494, minor, term to 2022-12-31
- BAKER FIELD STORAGE LINE #1 REPLACEMENT PROJECT, Baker: MTG770079, minor, term to 2020-12-31
- BAKER FIELD STORAGE LINE #1 REPLACEMENT PROJECT, Baker: MTR108122, minor, term to 2022-12-31
- BAKER LAKE CLEAN-UP PROJECT, Baker: MTR107051, minor, term to 2017-12-31
- BAKER RAILYARD, Baker: MTR000732, minor, term to 2023-01-31
- BAKER READY MIX FACILITY, Baker: MTR000470, minor, term to 2023-01-31
- CEDAR HILLS SOUTH UNIT (CHSU) LATERAL CO2 PIPELINE, Baker: MTR107649, minor, term to 2022-12-31
- CENTURY COMPANIES - BAKER MUNICIPAL AIRPORT, Baker: MTR104635, minor, term to 2012-12-31
- CITY OF BAKER WWTF, Baker: MTG580029, minor, term to 2022-12-31
- D AND M SOLUTIONS INC, Baker: MTR000184, minor, term to 2023-01-31
Nearby on the register
- Discharge permits in Baker
- Every permit record in Baker, A to Z
- Discharge permits in Montana
- Every permit record in Montana, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The PENNEL 17 PIPELINE REROUTE, a storm water construction coverage held by Bridger Pipeline LLC in Baker, Fallon County, Montana, is one of 39 such permits on EPA's NPDES register for that county, this one included. Among the 39 Fallon County storm water construction permits, 0.0% have a violation on file, and this permit likewise has no pollutant under a numeric limit or effluent exceedance on record. Within the Headwaters Sandstone Creek subwatershed, it is one of 21 NPDES permits, this one included.