NPDES MTR109596 · Clean Water Act
ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT, Anaconda, MT: NPDES MTR109596 discharge permit, effluent exceedances, inspections, penalties
ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT, Anaconda, Montana: General permit coverage MTR109596, held by BLACKFOOT TELEPHONE; Construction stormwater; Pending; discharges to SILVER LAKE.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file. BLACKFOOT TELEPHONE holds 5 permits in Montana.
Other permits held by BLACKFOOT TELEPHONE
- BOZEMAN TO BELGRADE, Bozeman: MTR106792, issued 2017-03-13
- BLACKFOOT TELEPHONE, Darby: MTR110380, issued 2023-10-05
- BLACKFOOT TELEPHONE, Darby: MTR110964, issued 2024-08-30
- BLACKFOOT COMMUNICATIONS, Darby: MTR111595
ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT among its neighbors
2 discharge permits are in the Georgetown Lake subwatershed (HUC 170102020103); MTR109596 is one. Its county: 26, 0 major; MTR109596 is a permit EPA has not classed major or minor.
Other permits in the Georgetown Lake subwatershed (HUC 170102020103)
- MDOT - STPP HSIP 19-1(48)GEORGETOWN PHILIPSBURG, Philipsburg: MTR104474, minor, term to 2012-12-31
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater.
Identity
| Facility | ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT |
|---|---|
| Permittee | BLACKFOOT TELEPHONE |
| NPDES ID | MTR109596 |
| Status | Pending |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Anaconda, MT 59711 |
| Receiving water | SILVER LAKE |
| Subwatershed | Georgetown Lake (HUC 170102020103) |
NPDES MTR109596: effluent limits and exceedances
ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT (NPDES MTR109596): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR109596: no pollutant row on file.
NPDES MTR109596: inspections, violations and enforcement
NPDES MTR109596 (ANACONDA/GEORGETOWN EXCHANGE, FIBER PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR109596
NPDES MTR109596: one email when its EPA record changes — $99/month.
Permits near NPDES MTR109596
NPDES MTR109596: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.