NPDES MTR109726 · Clean Water Act
YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1, Silver Gate, MT: NPDES MTR109726 discharge permit, effluent exceedances, inspections, penalties
YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1, Silver Gate, Montana: General permit coverage MTR109726, held by WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA; Construction stormwater; Administratively continued; issued September 15, 2022, term to December 31, 2022; discharges to SODA BUTTE CREEK.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,780 were issued before MTR109726. WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA holds 11 permits in Montana.
Other permits held by WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA
- CAMAS ROAD SLUMPS AND RESURFACE REMAINING 4 MILES, MT NPS GLAC 11(3), West Glacier: MTR108588, issued 2020-09-10
- LAKE MCDONALD UTILITY RELOCATION; MT PRA GLAC 10(44), West Glacier: MTR108628, issued 2021-01-06
- NORTH FORK OF THE FLATHEAD RIVER, MT FLATHEAD 486(1), Pole Bridge: MTR108733, issued 2021-01-22
- MCNAMARA ROAD MT BLM WMDD 0427 1 JOHNSRUD MCNAMARA ROADS MT MISSOULA 404 1, Missoula: MTR108946, issued 2021-07-21
- GOING TO THE SUN ROAD AND UPPER MCDONALD CREEK BRIDGE; MT PRA GLAC 10(45), West Glacier: MTR109124, issued 2021-09-01
- CHARLES M RUSSELL REFUGE REPAIRS, MT FWS CMR 61520(1), Zortman: MTR109293, issued 2022-02-10
- YELLOWSTONE NP OLD GARDNER ROAD EMERGENCY REPAIRS, Corwin Springs: MTR109676, issued 2022-07-14
- SWIFTCURRENT SPUR ROAD REHABILITATION, East Glacier Park: MTR110671, issued 2024-05-01
- SUN RIVER BRIDGE REPLACEMENT, MT FLAP BOR 2980(1), Augusta: MTR110953, issued 2024-08-29
- ROOSEVELT DRIVE SAFETY AND REALIGNMENT PROJECT, MT FLAP SILVER 2021(1), Butte: MTR111974, issued 2026-08-11
Coverages issued nearest MTR109726
- 2022-09-12: MISSOULA COUNTY PALLET SHELTERS & DETENTION PARKING, Missoula: MTR109791, held by KNIFE RIVER MISSOULA
- 2022-09-13: PPC REALIGNMENT TBC REMOVAL FORMER EAST HELENA SMELTER RCRA SITE, East Helena: MTR109802, held by PIONEER TECHNICAL SERVICES INC
- 2022-09-14: GARDINER SIMMENTAL PLAZA SUBDIVISION- FLOORING PLACE, Bozeman: MTR109778, held by WALKER CONSTRUCTION INC
- 2022-09-14: KAISER RANCH, Manhattan: MTR109779, held by POND AND STREAM CONSULTING INC
- 2022-09-14: PROJECT RIMROCK, Billings: MTR109789, held by Askin Construction LLC
- 2022-09-15: GALLATIN COUNTY COURT BUILDING, Bozeman: MTR109771, held by MARTEL CONSTRUCTION INC
- 2022-09-15: ASCIONE RESIDENCE, Big Sky: MTR109785, held by Big Sky Build, Inc.
- 2022-09-19: COMMUNITY HOSPITAL OF ANACONDA, Anaconda: MTR109796, held by JACKSON CONTRACTOR GROUP INC
- 2022-09-19: MOTOR VIEW STORAGE, Butte: MTR109799, held by Rowe Development
- 2022-09-19: BRETZ RV SERVICE CENTER ADDITION, Billings: MTR109806, held by Askin Construction LLC
YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1 among its neighbors
1 discharge permits are in the Upper Soda Butte Creek subwatershed (HUC 100700010702); MTR109726 is one. Its county: 80, 1 major; MTR109726 is minor permit.
What stands out
- Its term runs 107 days, September 15, 2022 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1 |
|---|---|
| Permittee | WESTERN FEDERAL LANDS HIGHWAY DIVISION FHWA |
| NPDES ID | MTR109726 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 15, 2022 |
| Expires | December 31, 2022 |
| Address | Silver Gate, MT 59081 |
| Receiving water | SODA BUTTE CREEK |
| Subwatershed | Upper Soda Butte Creek (HUC 100700010702) |
NPDES MTR109726: effluent limits and exceedances
YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1 (NPDES MTR109726): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR109726: no pollutant row on file.
NPDES MTR109726: inspections, violations and enforcement
NPDES MTR109726 (YELLOWSTONE NP NORTHEAST ENTRANCE ROAD REPAIRS PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR109726
NPDES MTR109726: one email when its EPA record changes — $99/month.
Permits near NPDES MTR109726
NPDES MTR109726: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.