NPDES MTR109807 · Clean Water Act
TONGUE RIVER DAM, Decker, MT: NPDES MTR109807 discharge permit, effluent exceedances, inspections, penalties
TONGUE RIVER DAM, Decker, Montana: General permit coverage MTR109807, held by OLYMPUS TECHNICAL SERVICES INC; Construction stormwater; Effective; issued September 22, 2022, term to December 31, 2022; discharges to TONGUE RIVER.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,790 were issued before MTR109807. OLYMPUS TECHNICAL SERVICES INC holds 4 permits in Montana.
Other permits held by OLYMPUS TECHNICAL SERVICES INC
- SPUR TRACK 752 FROM 123+0316, Frenchtown: MTR107039, issued 2017-08-25
- JOSLYN STREET TAILINGS FACILITY SOIL REMOVAL, Helena: MTR108645, issued 2020-09-30
- FLINT CREEK IRRIGATION CANAL - ADDITIVE ALTERNATE 1, Philipsburg: MTR111528, issued 2025-10-09
Coverages issued nearest MTR109807
- 2022-09-19: BRETZ RV SERVICE CENTER ADDITION, Billings: MTR109806, held by Askin Construction LLC
- 2022-09-19: WHITEFISH YARDS, Whitefish: MTR109810, held by LHC INC
- 2022-09-19: HAMILTON HIGH SCHOOL STADIUM COMPLEX FIELD, Hamilton: MTR109811, held by Hulteng CCM Inc
- 2022-09-20: DOMESTIC WASTEWATER TREATMENT FACILITY SLUDGE DRYING BEDS, Philipsburg: MTR109797, held by TOWN OF PHILIPSBURG
- 2022-09-21: LES SCHWAB TIRE CENTER BILLINGS, Billings: MTR109809, held by SLETTEN CONSTRUCTION
- 2022-09-23: GPIA - TERMINAL SANITARY SYSTEM, Kalispell: MTR109769, held by MONTANA CIVIL CONTRACTORS INC
- 2022-09-23: WWR, Bozeman: MTR109780, held by NORTH FORK BUILDERS INC
- 2022-09-23: HUNTER SUBSTATION, Fairview: MTR109800, held by Lower Yellowstone Rural Electric Cooperative
- 2022-09-23: ASHLEY CREEK BANK STABILIZATION, Kalispell: MTR109812, held by LHC INC
- 2022-09-28: CUT BANK SOLAR PARK INC, Cut Bank: MTR109788, held by Cut Bank Solar Park Inc
TONGUE RIVER DAM among its neighbors
2 discharge permits are in the Tongue River-Post Creek subwatershed (HUC 100901010601); MTR109807 is one. Its county: 70, 3 major; MTR109807 is minor permit.
Other permits in the Tongue River-Post Creek subwatershed (HUC 100901010601)
- SUMMIT GAS RESOURCES, INC., Decker: MT0030660, minor, term to 2009-12-31
What stands out
- Its term runs 100 days, September 22, 2022 to December 31, 2022; the term ended 1,354 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TONGUE RIVER DAM |
|---|---|
| Permittee | OLYMPUS TECHNICAL SERVICES INC |
| NPDES ID | MTR109807 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 22, 2022 |
| Expires | December 31, 2022 |
| Address | Decker, MT 59025 |
| Receiving water | TONGUE RIVER |
| Subwatershed | Tongue River-Post Creek (HUC 100901010601) |
NPDES MTR109807: effluent limits and exceedances
TONGUE RIVER DAM (NPDES MTR109807): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR109807: no pollutant row on file.
NPDES MTR109807: inspections, violations and enforcement
NPDES MTR109807 (TONGUE RIVER DAM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR109807
NPDES MTR109807: one email when its EPA record changes — $99/month.
Permits near NPDES MTR109807
NPDES MTR109807: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.