Clean Water Act discharge permit · NPDES MTR10I039

2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT, Arlee, MT: NPDES MTR10I039 discharge permit, effluent exceedances, inspections, penalties

2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT, held by The Confederated Salish & Kootenai Tribes Safety of Dams Program, holds NPDES permit MTR10I039. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for 2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT: its NPDES ID, its permit type and status, its its address in Arlee, Montana. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MTR10I039.

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater.

Identity

Facility as filed2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT
Permittee as filedThe Confederated Salish & Kootenai Tribes Safety of Dams Program
NPDES IDMTR10I039
Permit statusNot needed
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
AddressArlee, MT 59821
SubwatershedUpper Jocko River (HUC 170102120703)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES MTR10I039.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES MTR10I039.

Inspections

EPA’s inspection file holds no inspection for NPDES MTR10I039.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES MTR10I039.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MTR10I039.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MTR10I039 there.

2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT, Arlee, Montana: Coverage under a general permit MTR10I039, held by The Confederated Salish & Kootenai Tribes Safety of Dams Program; Construction stormwater; Not needed.

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file. The Confederated Salish & Kootenai Tribes Safety of Dams Program holds 4 permits in Montana.

Other permits held by The Confederated Salish & Kootenai Tribes Safety of Dams Program

2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT among its neighbors

4 discharge permits are in the Upper Jocko River subwatershed (HUC 170102120703); MTR10I039 is one.

Other permits in the Upper Jocko River subwatershed (HUC 170102120703)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The 2021 BLACK LAKE SEEPAGE IMPROVEMENTS PROJECT is one of 6 storm water construction permits on EPA's NPDES register in Arlee, Montana, and it is one of 4 NPDES permits in the Upper Jocko River subwatershed. Among those 6 Arlee storm water construction permits, 0.0% have a violation on file, and this permit has no pollutants under a numeric limit and no effluent exceedances.