NPDES MTR110093 · Clean Water Act
LOT 762 BARROWS FLANAGAN, Big Sky, MT: NPDES MTR110093 discharge permit, effluent exceedances, inspections, penalties
LOT 762 BARROWS FLANAGAN, Big Sky, Montana: General permit coverage MTR110093, held by SBC INC (SCHLAUCH BOTTCHER CONSTRUCTION INC); Construction stormwater; Effective; issued July 19, 2023, term to December 31, 2027; discharges to THIRD YELLOW MULE CREEK.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 1,904 were issued before MTR110093. SBC INC (SCHLAUCH BOTTCHER CONSTRUCTION INC) holds 21 permits in Montana.
Other permits held by SBC INC (SCHLAUCH BOTTCHER CONSTRUCTION INC)
- LOT 114 PH 1 & 2 - YMC, Big Sky: MTR107838, issued 2019-05-17
- LOT 756 LOWER GOLF COURSE - CARROLL, Big Sky: MTR108017, issued 2019-07-26
- TRACT 5, COS 2189B, GALLATIN COUNTY (TRAVERTINE), Big Sky: MTR108445, issued 2020-06-10
- BRICKMAN RESIDENCE, Belgrade: MTR108471, issued 2020-06-23
- ROCKING L RANCH - RESIDENCE, Bozeman: MTR108572, issued 2020-08-27
- MOONLIGHT TERRITORIES TRACT 16A, Big Sky: MTR108577, issued 2020-10-20
- YELLOWSTONE CLUB LOT 255, Big Sky: MTR108797, issued 2021-03-10
- BROWN RESIDENCE MOONLIGHT LOT 11, Big Sky: MTR109006, issued 2021-06-17
- LOT 752-BRADLEY RESIDENCE, Big Sky: MTR109023, issued 2021-07-07
- MOORE RESIDENCE MOONLITE LOT 13, Big Sky: MTR109112, issued 2021-08-13
Coverages issued nearest MTR110093
- 2023-06-29: NAMCHAK RETREAT RANCH - RANCH HEADQUARTERS, Hot Sprongs: MTR10I04J, held by Dick Anderson Construction
- 2023-07-06: BOZEMAN #2 TOWN PUMP, Bozeman: MTR110294, held by HOFFMANS R AND M SERVICES INC
- 2023-07-07: STILLWATER COUNTY ROAD REHABILITATION, Fishtail: MTR110278, held by Mystic Mountain
- 2023-07-11: RAVALLI COUNTY-CORVALLIS BOUNDARY-GRANT, Hamilton: MTR110299, held by Grizzly Broadband
- 2023-07-13: JACKRABBIT CROSSING INFRASTRUCTURE, Belgrade: MTR110310, held by CK May Excavating, Inc.
- 2023-07-20: FLINT CREEK ROAD PROJECT, Philipsburg: MTR110228, held by Northern Construction
- 2023-07-25: STABLES APPARTMENTS, Hamilton: MTR110309, held by MT Builders, Inc.
- 2023-07-26: RECONDITION 5 ADDITIONAL FORT KEOGH SPANS PROJECT, Miles City: MTR110327, held by WBI ENERGY TRANSMISSION INC
- 2023-07-26: 8458 SOUTH FRONTAGE ROAD, Billings: MTR110344, held by SAMM LLC
- 2023-08-08: BERT MOONEY BORROW DEVELOPEMENT, Butte: MTR110334, held by Jay Fortune Construction Inc
LOT 762 BARROWS FLANAGAN among its neighbors
125 discharge permits are in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201); MTR110093 is one. Its county: 780, 1 major; MTR110093 is minor permit.
Other permits in the South Fork West Fork Gallatin River subwatershed (HUC 100200080201)
- 14 MILLER LN, Big Sky: MTR111804, minor, term to 2027-12-31
- 16 MILLER LANE, Big Sky: MTR106511, minor, term to 2017-12-31
- 17 FOSSIL RD. LOT 60B ANDESITE, Big Sky: MTR111818, minor, term to 2027-12-31
- 60 STREAMSIDE WAY, Big Sky: MTR111885, minor, term to 2027-12-31
- ADDISON FAMILY RESIDENCE, Big Sky: MTR111226, minor, term to 2027-12-31
- ALPINE CREEK RESTORATION - UNNAMED TRIB TO GALLATIN 318 PERMIT, Big Sky: MTB004208
- AMERICAN SPIRIT DEVELOPMENT, Big Sky: MTR105882, minor, term to 2017-12-31
- AMERICAN SPIRIT PH 1 SUBDIV LOT 806 LOT 815 YMC, Big Sky: MTR105893, minor, term to 2017-12-31
- BIG SKY BUILD - LOT 401 PH 3A YELLOWSTONE MOUNTAIN CLUB, Big Sky: MTR104695, minor, term to 2012-12-31
- BIG SKY BUILD - LOT 605 - RISLEY RESIDENCE, Big Sky: MTR104169, minor, term to 2011-12-31
What stands out
- Its term runs 4 years and 165 days, July 19, 2023 to December 31, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LOT 762 BARROWS FLANAGAN |
|---|---|
| Permittee | SBC INC (SCHLAUCH BOTTCHER CONSTRUCTION INC) |
| NPDES ID | MTR110093 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 19, 2023 |
| Expires | December 31, 2027 |
| Address | Big Sky, MT 59716 |
| Receiving water | THIRD YELLOW MULE CREEK |
| Subwatershed | South Fork West Fork Gallatin River (HUC 100200080201) |
| SIC | 1521 – Single-Family Housing Construction |
NPDES MTR110093: effluent limits and exceedances
LOT 762 BARROWS FLANAGAN (NPDES MTR110093): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR110093: no pollutant row on file.
NPDES MTR110093: inspections, violations and enforcement
NPDES MTR110093 (LOT 762 BARROWS FLANAGAN): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR110093
NPDES MTR110093: one email when its EPA record changes — $99/month.
Permits near NPDES MTR110093
NPDES MTR110093: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.