HOBSON WASTEWATER SYSTEM REHABILITATION, Hobson, MT: NPDES MTR111108 discharge permit, effluent exceedances, inspections, penalties
HOBSON WASTEWATER SYSTEM REHABILITATION, Hobson, Montana: General permit coverage MTR111108, held by WESTERN MUNICIPAL CONSTRUCTION INC; Construction stormwater; Effective; issued February 14, 2025, term to December 31, 2027; discharges to JUDITH RIVER.
- October 15, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- October 15, 2025: WW Storm Water Construction - Failure to Maintain Records (ST6).
- October 15, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- October 15, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 2,097 were issued before MTR111108. WESTERN MUNICIPAL CONSTRUCTION INC holds 19 permits in Montana.
Other permits held by WESTERN MUNICIPAL CONSTRUCTION INC
- WESTERN MUNICIPAL CONSTRUCTION - EMMANUEL BAPTIST CHURCH SEWER EXTENSION, Billings: MTG070622
- WESTERN MUNICIPAL CONSTR - LOCKWOOD WATER AND SEWER, Billings: MTG070691
- W.O. 15-35:ZONE 1 WTP WATERLINE IMPROVEMENTS, Billings: MTG070972, issued 2020-02-03
- POLSON SEWER COLLECTION SYSTEM IMPROVEMENTS, Polson: MTG071058
- CITY OF BILLINGS W.O. 20-01 PHASE 2 SANITARY SEWER INTERCEPTOR REPLACEMENT, Billings: MTG071111
- MILES CITY - CCWSD FIRE HYDRANT (S. HAYNES AVE), Miles City: MTG071112
- W.O. 26-01 - CITY OF BILLINGS - SEWER MAIN REPLACEMENTS, Billings: MTG071464, issued 2026-07-21
- BAKER LAKE CLEAN-UP PROJECT, Baker: MTR107051, issued 2017-09-06
- LOCKWOOD INTAKE AND WATER TREATMENT PLANT, Billings: MTR107107, issued 2017-11-15
- POLSON SEWER COLLECTION SYSTEM IMPROVEMENTS, Polson: MTR108807
Coverages issued nearest MTR111108
- 2025-01-30: HD FOWLER - BELGRADE, Belgrade: MTR111121, held by DICK ANDERSON CONSTRUCTION, INC. - MAIN
- 2025-01-31: BAD ROUTE INTERCHANGE, Fallon: MTR111083, held by RIVERSIDE CONTRACTING INC
- 2025-02-04: BUFFALO RESTORATION, Bozeman: MTR110952, held by Buffalo Restoration
- 2025-02-12: WWTP TO CEDAR WATER MAIN REPLACEMENT, Colstrip: MTR111134, held by COP CONSTRUCTION LLC
- 2025-02-13: COPPERSTONE STORAGE, Missoula: MTR110951, held by KNIFE RIVER MISSOULA
- 2025-02-17: 9601000 SF 179 ASHLAND RABBITTOWN PATH HSIP 37-2(43)61, Ashland: MTR10I05K, held by Montana Department of Transportation
- 2025-02-18: GRASS VALLEY INDUSTRIAL, Missoula: MTR111114, held by DICK ANDERSON CONSTRUCTION, INC. - MAIN
- 2025-02-19: JOCKO RIVER RESTORATION PROJECT - JOCKO BISON RANGE, Dixon: MTR10I05M, held by Nate Wyatt
- 2025-02-19: 9601000 SF 179 ASHLAND RABBITTOWN PATH HSIP 37-2(43)61, Ashland: MTR10I05N, held by Battle Ridge Builders
- 2025-02-19: WHITEFISH CORRIDOR COMMUNITY, Whitefish: MTR110650, held by Alvin McDonald Ruis Jr
HOBSON WASTEWATER SYSTEM REHABILITATION among its neighbors
5 discharge permits are in the Judith River-Hobson subwatershed (HUC 100401030509); MTR111108 is one. Its county: 24, 0 major; MTR111108 is minor permit.
Other permits in the Judith River-Hobson subwatershed (HUC 100401030509)
- HOBSON SEWAGE TREATMENT PLANT, Hobson: MT0021636, minor, term to 2017-10-31
- HOBSON SEWAGE TREATMENT PLANT, Hobson: MTL021636, minor, term to 2030-12-31
- NELCON - 7KM E OF WINDHAM EAST NH-HSIP 57-2(24)47, Windham: MTR104437, minor, term to 2012-12-31
- NELCON INC - DEICHMANN GRAVEL SITE, Hobson: MTR104287, minor, term to 2011-12-31
What stands out
- Its term runs 2 years and 320 days, February 14, 2025 to December 31, 2027.
- Its newest dated event on file is a single-event violation on October 15, 2025, 364 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 4 single-event violations.
- EPA's file dates 4 events for it, all in 2025.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HOBSON WASTEWATER SYSTEM REHABILITATION |
|---|---|
| Permittee | WESTERN MUNICIPAL CONSTRUCTION INC |
| NPDES ID | MTR111108 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 14, 2025 |
| Expires | December 31, 2027 |
| Address | Hobson, MT 59452 |
| Receiving water | JUDITH RIVER |
| Subwatershed | Judith River-Hobson (HUC 100401030509) |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES MTR111108: effluent limits and exceedances
HOBSON WASTEWATER SYSTEM REHABILITATION (NPDES MTR111108): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR111108: no pollutant row on file.
NPDES MTR111108: inspections, violations and enforcement
NPDES MTR111108: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| October 15, 2025 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| October 15, 2025 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| October 15, 2025 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| October 15, 2025 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES MTR111108 (HOBSON WASTEWATER SYSTEM REHABILITATION): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR111108
NPDES MTR111108: one email when its EPA record changes — $99/month.
Permits near NPDES MTR111108
NPDES MTR111108: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.