WYNNE AVENUE PHASE 4, Butte, MT: NPDES MTR111271 discharge permit, effluent exceedances, inspections, penalties

WYNNE AVENUE PHASE 4, Butte, Montana: General permit coverage MTR111271, held by 2B HOLDINGS LLC; Construction stormwater; Effective; issued May 8, 2025, term to December 31, 2027; discharges to SAND CREEK.

  • October 21, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • October 21, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • October 21, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • October 21, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 2,172 were issued before MTR111271. 2B HOLDINGS LLC holds 6 permits in Montana.

Other permits held by 2B HOLDINGS LLC

Coverages issued nearest MTR111271

WYNNE AVENUE PHASE 4 among its neighbors

32 discharge permits are in the Silver Bow Creek-Butte subwatershed (HUC 170102010204); MTR111271 is one. Its county: 103, 3 major; MTR111271 is minor permit.

Other permits in the Silver Bow Creek-Butte subwatershed (HUC 170102010204)

What stands out

  • Its term runs 2 years and 237 days, May 8, 2025 to December 31, 2027.
  • Its newest dated event on file is a single-event violation on October 21, 2025, 329 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 4 single-event violations.
  • EPA's file dates 4 events for it, all in 2025.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityWYNNE AVENUE PHASE 4
Permittee2B HOLDINGS LLC
NPDES IDMTR111271
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMay 8, 2025
ExpiresDecember 31, 2027
AddressButte, MT 59701
Receiving waterSAND CREEK
SubwatershedSilver Bow Creek-Butte (HUC 170102010204)

NPDES MTR111271: effluent limits and exceedances

WYNNE AVENUE PHASE 4 (NPDES MTR111271): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES MTR111271: no pollutant row on file.

NPDES MTR111271: inspections, violations and enforcement

NPDES MTR111271: 4 single-event violations

DateWhat EPA recordedAgency
October 21, 2025WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6
October 21, 2025WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
October 21, 2025WW Storm Water Construction - Failure to properly install/implement BMPsST6
October 21, 2025WW Storm Water Construction - Failure to Conduct InspectionsST6

NPDES MTR111271 (WYNNE AVENUE PHASE 4): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES MTR111271

NPDES MTR111271: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES MTR111271

NPDES MTR111271: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded September 15, 2026.