Clean Water Act discharge permit · NPDES MTR111830

RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2, Red Lodge, MT: NPDES MTR111830 discharge permit, effluent exceedances, inspections, penalties

RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2, held by Wadsworth Brothers Construction, holds NPDES permit MTR111830, which discharges to Rock Creek. EPA’s file records it issued May 14, 2026 and expiring December 31, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2: its NPDES ID, its permit type and status, its dates, its address in Red Lodge, Montana, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MTR111830.

What stands out

  • Its term runs 1 year and 231 days, May 14, 2026 to December 31, 2027.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedRED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2
Permittee as filedWadsworth Brothers Construction
NPDES IDMTR111830
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedMay 14, 2026
Expiration dateDecember 31, 2027
AddressRed Lodge, MT 59068
Receiving waterROCK CREEK
SubwatershedRock Creek-Wyoming Creek (HUC 100700060901)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES MTR111830.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES MTR111830.

Inspections

EPA’s inspection file holds no inspection for NPDES MTR111830.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES MTR111830.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MTR111830.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MTR111830 there.

RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2, Red Lodge, Montana: Coverage under a general permit MTR111830, held by Wadsworth Brothers Construction; Construction stormwater; Effective; issued May 14, 2026, term to December 31, 2027; discharges to ROCK CREEK.

Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 2,504 were issued before MTR111830. Wadsworth Brothers Construction holds 4 permits in Montana.

Other permits held by Wadsworth Brothers Construction

Coverages issued nearest MTR111830

RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2 among its neighbors

2 discharge permits are in the Rock Creek-Wyoming Creek subwatershed (HUC 100700060901); MTR111830 is one. Its county: 66, 1 major; MTR111830 is minor permit.

Other permits in the Rock Creek-Wyoming Creek subwatershed (HUC 100700060901)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The Rock Creek-Wyoming Creek subwatershed holds 2 NPDES permits, a count that includes this permit. In Carbon County, 38 storm water construction permits are on the register, 2.6% of them have a violation on file, and 81.8% of the 33 permits that include this permit were issued before the permit under RED LODGE AREA FLOOD REPAIRS, RP 57.5 SLIDE REPAIR - SLOPE PROTECTION (PHASE 2.