NPDES MTR111842 · Clean Water Act
VIGILANTE ELECTRICAL CO-OP, Dillon, MT: NPDES MTR111842 discharge permit, effluent exceedances, inspections, penalties
VIGILANTE ELECTRICAL CO-OP, Dillon, Montana: General permit coverage MTR111842, held by LANGLAS AND ASSOCIATES INC; Construction stormwater; Effective; issued June 10, 2026, term to December 31, 2027; discharges to OWEN DITCH.
Montana holds 2,848 Construction stormwater coverages of this permit type in EPA’s file; 2,549 were issued before MTR111842. LANGLAS AND ASSOCIATES INC holds 15 permits in Montana.
Other permits held by LANGLAS AND ASSOCIATES INC
- BRIDGER VIEW REDEVELOPMENT, Bozeman: MTR108740, issued 2021-03-24
- MP YELLOWSTONE LLC, Big Sky: MTR109742, issued 2022-08-17
- SIX RANGE CONDOS, Bozeman: MTR109820, issued 2022-10-07
- YELLOWTAIL DEVELOPMENT, Big Sky: MTR110150, issued 2023-05-04
- RESILIENCE HOLDINGS LLC, Big Sky: MTR110710, issued 2024-04-09
- HAMPTON INN, Bozeman: MTR110871, issued 2024-07-17
- BZN FBO TERMINAL AND HANGAR, Belgrade: MTR110941, issued 2024-09-25
- THE VIM HOTEL - MSU, Bozeman: MTR111527, issued 2025-09-17
- BOZEMAN YARDS- SOUTH, Bozeman: MTR111630, issued 2026-01-29
- WESTATE MACHINERY, Missoula: MTR111684, issued 2026-03-27
Coverages issued nearest MTR111842
- 2026-06-08: GRANT CREEK CROSSING, Missoula: MTR111879, held by KNIFE RIVER MISSOULA
- 2026-06-08: FORT HARRISON BUILDING 530 COMPOUND IMPROVEMENTS, Fort Harrison: MTR111881, held by HELENA SAND AND GRAVEL INC
- 2026-06-08: W.O. 2026 BILLINGS WATER MAIN REPLACEMENT, Billings: MTR111886, held by COP CONSTRUCTION LLC
- 2026-06-09: 60 STREAMSIDE WAY, Big Sky: MTR111885, held by BIG SKY BUILD INC
- 2026-06-10: RED MOUNTAIN FLUME, Helena: MTR111742, held by HARD ROCK ROAD BUILDING UTILITIES INC
- 2026-06-10: FINALE DAM RECONSTRUCTION, Glasgow: MTR111849, held by YOUDERIAN CONSTRUCTION INC
- 2026-06-10: GROPPER RESIDENCE - LOT 816 AMERICAN SPIRIT, Big Sky: MTR111869, held by TETON HERITAGE BUILDERS
- 2026-06-11: INSPIRATION WAY SUBDIVISION, Columbia Falls: MTR111877, held by T&S Cheff Construction LLC
- 2026-06-12: DEER LODGE MEDICAL CENTER, Deer Lodge: MTR111801, held by SLETTEN CONSTRUCTION COMPANY
- 2026-06-15: SWAN VIEW ESTATES SUBDIVISION, Kalispell: MTR111878, held by Liberty Land Group, LLC
VIGILANTE ELECTRICAL CO-OP among its neighbors
8 discharge permits are in the Beaverhead River-Stodden Slough subwatershed (HUC 100200020603); MTR111842 is one. Its county: 49, 0 major; MTR111842 is minor permit.
Other permits in the Beaverhead River-Stodden Slough subwatershed (HUC 100200020603)
- BEAVER PRIDE, Dillon: MTR109824, minor, term to 2022-12-31
- BEAVERHEAD COUNTY WEED DIST BEAVERHEAD RIVER CORRIDOR PESTICIDE, Dillon: MTG870001, minor, term to 2016-10-31
- BLM, Dillon: MTR109744, minor, term to 2022-12-31
- DILLON STOCKMAN BANK, Dillon: MTR111835, minor, term to 2027-12-31
- JOHN ERB - EAST BENCH FEEDLOT, Dillon: MTG010179, minor, term to 2018-10-31
- THE HOMESTEAD, Dillon: MTR111530, minor, term to 2027-12-31
- WISDOM WASTEWATER LAGOON, Dillon: MTG650040
What stands out
- Its term runs 1 year and 204 days, June 10, 2026 to December 31, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,574 discharge permits on the register in Montana; 2,849 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | VIGILANTE ELECTRICAL CO-OP |
|---|---|
| Permittee | LANGLAS AND ASSOCIATES INC |
| NPDES ID | MTR111842 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 10, 2026 |
| Expires | December 31, 2027 |
| Address | Dillon, MT 59725 |
| Receiving water | OWEN DITCH |
| Subwatershed | Beaverhead River-Stodden Slough (HUC 100200020603) |
NPDES MTR111842: effluent limits and exceedances
VIGILANTE ELECTRICAL CO-OP (NPDES MTR111842): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MTR111842: no pollutant row on file.
NPDES MTR111842: inspections, violations and enforcement
NPDES MTR111842 (VIGILANTE ELECTRICAL CO-OP): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MTR111842
NPDES MTR111842: one email when its EPA record changes — $99/month.
Permits near NPDES MTR111842
NPDES MTR111842: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.