NPDES NCC201448 · Clean Water Act
PHASE IV ROGERS CCP LANDFILL CONSTRUCTION, Mooresboro, NC: NPDES NCC201448 discharge permit, effluent exceedances, inspections, penalties
PHASE IV ROGERS CCP LANDFILL CONSTRUCTION, Mooresboro, North Carolina: General permit coverage NCC201448, held by Duke Energy Carolinas, LLC; Effective; issued April 1, 2024, term to March 31, 2029.
Other permits held by Duke Energy Carolinas, LLC
- PHASE III ROGERS CCP LANDFILL CONSTRUCTION, Cliffside: NCC192861, issued 2024-04-01
- MT. HOLLY TRAINING BUILDING SITE IMPROVEMENTS, Mt. Holly: NCC192900, issued 2024-04-01
- PHASE III ROGERS CCP LANDFILL CONSTRUCTION STOCKPILES, Mooresboro: NCC200944, issued 2024-04-01
- CLIFFSIDE-ASH STORAGE AREA 1 AND HAUL ROUTE IMP., Mooresboro: NCC202649, issued 2024-04-01
- FUTURE LANDFILL TIMBERING OPERATIONS E&SC PLAN, Belews Creek: NCC203380, issued 2024-04-01
- MARSHALL PHASE 2 INDUSTRIAL LANDFILL (CELLS 5 & 6), Sherrills Ford: NCC212179, issued 2024-04-01
- ALLEN SOUTH STARTER LANDFILL CONSTRUCTION, Belmont: NCC212593, issued 2024-04-01
- SCIENTIFIC ST., High Point: NCC212737, issued 2024-04-01
- UNIT 5 INACTIVE ASH BASIN - CLOSURE EXCAVATION PHASE 1, Mooresboro: NCC213135, issued 2024-04-01
- ACTIVE ASH BASIN REMOVAL HAUL ROUTE IMPROVEMENTS, Mooresboro: NCC214095, issued 2024-04-01
PHASE IV ROGERS CCP LANDFILL CONSTRUCTION among its neighbors
14 discharge permits are in the Suck Creek-Broad River subwatershed (HUC 030501050506); NCC201448 is one.
Other permits in the Suck Creek-Broad River subwatershed (HUC 030501050506)
- 2251 RIVERSIDE RD., Shelby: NCC224220, minor, term to 2029-03-31
- ACTIVE ASH BASIN - PHASE 0 - VEGETATION CLEARING, Mooresboro: NCC220075, minor, term to 2029-03-31
- ACTIVE ASH BASIN REMOVAL HAUL ROUTE IMPROVEMENTS, Mooresboro: NCC214095, minor, term to 2029-03-31
- CLIFFSIDE-ASH STORAGE AREA 1 AND HAUL ROUTE IMP., Mooresboro: NCC202649, minor, term to 2029-03-31
- CONTINENTALS RV PARK, Gaffney: SCR10ZHBM, minor, term to 2030-04-03
- DUKE ENERGY-UNIT 5 INACTIVE ASH BASIN IMPOUNDMENT CLOSURE-PHASE 6 ECP, Mooresboro: NCC233392, minor, term to 2029-03-31
- LILLY MAE SUBDIVISION, Gaffney: SCR10ZDRM, minor, term to 2028-09-21
- PHASE III ROGERS CCP LANDFILL CONSTRUCTION, Cliffside: NCC192861, minor, term to 2029-03-31
- PHASE III ROGERS CCP LANDFILL CONSTRUCTION STOCKPILES, Mooresboro: NCC200944, minor, term to 2029-03-31
- UNIT 5 INACTIVE ASH BASIN - CLOSURE EXCAVATION PHASE 1, Mooresboro: NCC213135, minor, term to 2029-03-31
Identity
| Facility | PHASE IV ROGERS CCP LANDFILL CONSTRUCTION |
|---|---|
| Permittee | Duke Energy Carolinas, LLC |
| NPDES ID | NCC201448 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | April 1, 2024 |
| Expires | March 31, 2029 |
| Address | Mooresboro, NC 28114 |
| Subwatershed | Suck Creek-Broad River (HUC 030501050506) |
| SIC | 1541 – Industrial Buildings And Warehouses |
NPDES NCC201448: effluent limits and exceedances
PHASE IV ROGERS CCP LANDFILL CONSTRUCTION (NPDES NCC201448): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NCC201448: no pollutant row on file.
NPDES NCC201448: inspections, violations and enforcement
NPDES NCC201448 (PHASE IV ROGERS CCP LANDFILL CONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NCC201448
NPDES NCC201448: one email when its EPA record changes — $99/month.
Permits near NPDES NCC201448
NPDES NCC201448: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.