NPDES NCS000580 · Clean Water Act
MAYO STEAM ELECTRIC POWER PLANT, Roxboro, NC: NPDES NCS000580 discharge permit, effluent exceedances, inspections, penalties
MAYO STEAM ELECTRIC POWER PLANT, Roxboro, North Carolina: Individual permit NCS000580, held by Duke Energy Progress LLC; Industrial stormwater; Effective; issued August 4, 2023, term to August 31, 2028.
- March 12, 2026: Evaluation (S).
North Carolina holds 63 Industrial stormwater coverages of this permit type in EPA’s file; 48 were issued before NCS000580. Duke Energy Progress LLC holds 24 permits in North Carolina.
Other permits held by Duke Energy Progress LLC
- ASHEVILLE COMBINED CYCLE PLANT, Arden: NC0000396, issued 2022-02-11
- LEE STEAM ELECTRIC PLANT, Goldsboro: NC0003417, issued 2025-04-16
- ROXBORO STEAM ELECTRIC POWER PLANT, Semora: NC0003425, issued 2021-06-25
- WEATHERSPOON STEAM ELECTRIC PLANT, Lumberton: NC0005363, issued 2018-08-03
- SHEARON HARRIS NUCLEAR POWER PLANT, New Hill: NC0039586, issued 2016-08-29
- EAST ASH BASIN SOUTHEAST DIVERSION CHANNEL, Semora: NCC212092, issued 2024-04-01
- ROXBORO BORROW AREA 1 MINING PLAN, Semora: NCC212836, issued 2024-04-01
- ROXBORO INDUSTRIAL LANDFILL EXPANSION E&SC PLAN, Semora: NCC213172, issued 2024-04-01
- MAYO MONOFILL BORROW AREA, Roxboro: NCC215050, issued 2024-04-01
- ROXBORO BIOREACTOR DEMOLITION AND EROSION AND SEDIMENT CONTROL PLAN, Semora: NCC220852, issued 2024-04-01
Coverages issued nearest NCS000580
- 2022-04-12: ALLEN STEAM STATION, Charlotte: NCS000546, held by Duke Energy Carolinas LLC
- 2022-05-12: GALVAN INDUSTRIES - HARRISBURG, Harrisburg: NCS000597, held by Galvan Industries
- 2023-01-09: MICHELIN AIRCRAFT TIRE COMPANY, A DIVISION OF MICHELIN N. AMERICA, INC., Norwood: NCS000373, held by Michelin Aircraft Tire Company A Division of Michelin N America Inc
- 2023-02-20: GOLDSTON LUMBER SUPPLY, Goldston: NCS000610, held by Goldston Lumber Supply LLC
- 2023-05-24: SCM METAL PRODUCTS, LLC, Durham: NCS000050, held by SCM Metal Products, Inc.
- 2023-09-27: SHEARON HARRIS NUCLEAR POWER PLANT, New Hill: NCS000606, held by Duke Energy Progress LLC
- 2023-10-18: COVATION BIOMATERIALS KINSTON SITE, Grifton: NCS000608, held by Covation Biomaterials LLC
- 2023-10-18: KLEEN TECH INC, Hildebran: NCS000609, held by Kleen Tech Inc
- 2024-01-11: BRENNTAG CHARLOTTE, Charlotte: NCS000611, held by Brenntag Mid-South Inc
- 2024-01-11: BRENNTAG SOUTHEAST INC., Durham: NCS000612, held by Brenntag Mid-South Inc
MAYO STEAM ELECTRIC POWER PLANT among its neighbors
3 discharge permits are in the Tabbs Creek subwatershed (HUC 030201010203); NCS000580 is one.
Other permits in the Tabbs Creek subwatershed (HUC 030201010203)
- 2584 HIGH PLAINS ROAD, Roxboro: NCG551034, minor, term to 2025-10-31
- THE PINES AT POND VALLEY, Henderson: NCC222911, minor, term to 2029-03-31
What stands out
- Its term runs 5 years and 27 days, August 4, 2023 to August 31, 2028.
- Its newest dated event on file is an inspection on March 12, 2026, 187 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 19,518 discharge permits on the register in North Carolina; 3,374 of them (17%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | MAYO STEAM ELECTRIC POWER PLANT |
|---|---|
| Permittee | Duke Energy Progress LLC |
| NPDES ID | NCS000580 |
| Status | Effective |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | August 4, 2023 |
| Expires | August 31, 2028 |
| Address | Roxboro, NC 27573 |
| Subwatershed | Tabbs Creek (HUC 030201010203) |
| Other EPA IDs (FRS) | RCRA handler NCD000830612; ICIS-AIR source NC0000003707300045 |
NPDES NCS000580: effluent limits and exceedances
MAYO STEAM ELECTRIC POWER PLANT (NPDES NCS000580): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NCS000580: no pollutant row on file.
NPDES NCS000580: inspections, violations and enforcement
NPDES NCS000580: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 12, 2026 | Evaluation | S |
NPDES NCS000580 (MAYO STEAM ELECTRIC POWER PLANT): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES NCS000580
NPDES NCS000580: one email when its EPA record changes — $99/month.
Permits near NPDES NCS000580
NPDES NCS000580: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded September 15, 2026.