NPDES NDG070760 · Clean Water Act
NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760, (Unknown City), ND: NPDES NDG070760 discharge permit, effluent exceedances, inspections, penalties
NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760, (Unknown City), North Dakota: General permit coverage NDG070760, held by Enbridge Pipelines (North Dakota) LLC; Administratively continued; issued March 30, 2020, term to March 31, 2025, by North Dakota Department of Environmental Quality.
No violation or effluent exceedance is on file for any of the 7 pollutants listed for NPDES NDG070760.
- Flow, in conduit or thru treatment plant: 4 limits.
- pH: 2 limits.
- Flow, total: 2 limits.
- Hydrocarbons, total petroleum: 2 limits.
- Oil and grease visual: 2 limits.
- Solids, total suspended: 1 limit.
- Chlorine, total residual: 1 limit.
Other permits held by Enbridge Pipelines (North Dakota) LLC
- ENBRIDGE PIPELINES (LAKEHEAD), LLC - NDG070355, (Unknown City): NDG070355, issued 2020-03-30
- ENBRIDGE PIPELINES (LAKEHEAD) LLC - NDG070356, (Unknown City): NDG070356, issued 2020-03-30
- ENBRIDGE PIPELINES (LAKEHEAD) LLC - NDG070365, (Unknown City): NDG070365, issued 2020-03-30
- ENBRIDGE ENERGY, LIMITED PARTNERSHIP - NDG070460, (Unknown City): NDG070460, issued 2020-03-30
- ENBRIDGE ENERGY, LIMITED PARTNERSHIP - NDG070511, (Unknown City): NDG070511, issued 2020-03-30
- NORTH DAKOTA PIPELINE COMPANY, LLC - NDG070572, (Unknown City): NDG070572, issued 2020-03-30
- NORTH DAKOTA PIPELINE COMPANY, LLC - NDG070579, (Unknown City): NDG070579, issued 2020-03-30
- ENBRIDGE ENERGY LIMITED PARTNERSHIP - NDG070603, (Unknown City): NDG070603, issued 2020-03-30
- NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070759, (Unknown City): NDG070759, issued 2020-03-30
- NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070761, (Unknown City): NDG070761, issued 2020-03-30
NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760 among its neighbors
38 discharge permits are in the Saint Louis River subwatershed (HUC 040102011604); NDG070760 is one. Its county: 97, 2 major; NDG070760 is minor permit.
Other permits in the Saint Louis River subwatershed (HUC 040102011604)
- ARROW PIPELINE LLC, Unknown: NDR108788, minor, term to 2020-03-31
- BNSF RAILWAY SITE, Superior: WIG006985, minor, term to 2026-09-30
- C&C HOLDINGS, LLC SITE, Superior: WIG012428, minor, term to 2026-09-30
- CMC PROPERTIES, LLC SITE, Superior: WIG008157, minor, term to 2026-09-30
- DMIRR CO-DULUTH ORE DOCK, Duluth: MN0053384, minor, term to 2009-10-31
- ENBRIDGE ENERGY LIMITED PARTNERSHIP - NDG070603, (Unknown City): NDG070603, minor, term to 2025-03-31
- ENBRIDGE ENERGY, LIMITED PARTNERSHIP - NDG070460, (Unknown City): NDG070460, minor, term to 2025-03-31
- ENBRIDGE ENERGY, LIMITED PARTNERSHIP - NDG070511, (Unknown City): NDG070511, minor, term to 2025-03-31
- ENBRIDGE ENERGY, LIMITED PARTNERSHIP, LLC SITE, Superior: WIG008584, minor, term to 2026-09-30
- ENBRIDGE PIPELINES (LAKEHEAD) LLC - NDG070356, (Unknown City): NDG070356, minor, term to 2025-03-31
What stands out
- Its term runs 5 years and 1 day, March 30, 2020 to March 31, 2025; the term ended 533 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,594 discharge permits on the register in North Dakota; the file names no program for it, and it is a minor discharger.
Identity
| Facility | NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760 |
|---|---|
| Permittee | Enbridge Pipelines (North Dakota) LLC |
| NPDES ID | NDG070760 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | March 30, 2020 |
| Expires | March 31, 2025 |
| Agency | North Dakota Department of Environmental Quality |
| Address | (Unknown City), ND |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Saint Louis River (HUC 040102011604) |
NPDES NDG070760: effluent limits and exceedances
NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760 (NPDES NDG070760): 7 pollutants on file, 7 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Flow, in conduit or thru treatment plant | 4 | 0 | 0 | ||
| pH | 2 | 0 | 0 | ||
| Flow, total | 2 | 0 | 0 | ||
| Hydrocarbons, total petroleum | 2 | 0 | 0 | ||
| Oil and grease visual | 2 | 0 | 0 | ||
| Solids, total suspended | 1 | 0 | 0 | ||
| Chlorine, total residual | 1 | 0 | 0 |
NPDES NDG070760: inspections, violations and enforcement
NPDES NDG070760 (NORTH DAKOTA PIPELINE COMPANY (NDPL) - NDG070760): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NDG070760
NPDES NDG070760: one email when its EPA record changes — $99/month.
Permits near NPDES NDG070760
NPDES NDG070760: 7 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.