Clean Water Act discharge permit · NPDES NDR10I05W
BIRD BEAR SITE, Mandaree, ND: NPDES NDR10I05W discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
BIRD BEAR SITE, held by Mayo Construction Company, Inc., holds NPDES permit NDR10I05W. EPA’s file records it issued April 17, 2025 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for BIRD BEAR SITE: its NPDES ID, its permit type and status, its dates, its address in Mandaree, North Dakota. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES NDR10I05W.
What stands out
- Its term runs 1 year and 305 days, April 17, 2025 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,594 discharge permits on the register in North Dakota; 2,244 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | BIRD BEAR SITE |
|---|---|
| Permittee as filed | Mayo Construction Company, Inc. |
| NPDES ID | NDR10I05W |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 17, 2025 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Mandaree, ND 58757 |
| Subwatershed | Bear Den Bay (HUC 101101012004) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES NDR10I05W.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES NDR10I05W.
Inspections
EPA’s inspection file holds no inspection for NPDES NDR10I05W.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES NDR10I05W.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, NDR10I05W.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID NDR10I05W there.
BIRD BEAR SITE, Mandaree, North Dakota: Coverage under a general permit NDR10I05W, held by Mayo Construction Company, Inc.; Construction stormwater; Effective; issued April 17, 2025, term to February 16, 2027, by U.S. EPA.
North Dakota holds 2,244 Construction stormwater coverages of this permit type in EPA’s file; 1,343 were issued before NDR10I05W. Mayo Construction Company, Inc. holds 6 permits in North Dakota.
Other permits held by Mayo Construction Company, Inc.
- NH-RAI-3-281(144)238 PCN: 23929 BELCOURT BIKE PATH, Belcourt: NDR10I06M, issued 2026-05-25
- NH-RAI-3-281(144)238 PCN: 23929, Belcourt: NDR10I06N, issued 2026-05-29
- MAYO CONSTRUCTION COMPANY, INC - JOHANSSEN PIT, Edinburg: NDR320903, issued 2019-12-23
- MAYO CONSTRUCTION COMPANY, INC - RES LINE PIT, Belcourt: NDR320904, issued 2019-12-23
- MAYO CONSTRUCTION COMPANY, INC - HYLDEN PIT, Fordville: NDR320905, issued 2019-12-23
Coverages issued nearest NDR10I05W
- 2025-04-15: 25045 - ENNIS BORROW, Berthold: NDR113279, held by Luke Lippert
- 2025-04-15: 25045 - MYERS BORROW, Berthold: NDR113280, held by Luke Lippert
- 2025-04-16: 25017 - CRUSHING SITE, Williston: NDR113281, held by Luke Lippert
- 2025-04-16: JOHN RIAN SUBDIVISION MOUNTRAIL CO, Palermo: NDR113282, held by Luci Snowden
- 2025-04-16: STRATA-21984, Rugby: NDR113283, held by Sarah Anderson
- 2025-04-21: XA-SS-5-022(143)126 PCN: 23547, Mandaree: NDR10I05Y, held by North Dakota Department of Transportation
- 2025-04-21: CITY OF GRAND FORKS - STORMWATER CONSTRUCTION, Grand Forks: NDR113284, held by Justin Storm
- 2025-04-21: CHS INC. - STORMWATER CONSTRUCTION, Lansford: NDR113508, held by Doug Naze
- 2025-04-23: PEMBINA CO BEAULIEU AKRA STRUCTURE REPLACEMENT, Cavalier: NDR113286, held by Luke Paine
- 2025-04-24: SOUTH HIGH, Fargo: NDR113287, held by Lexie Grandalen
BIRD BEAR SITE among its neighbors
3 discharge permits are in the Bear Den Bay subwatershed (HUC 101101012004); NDR10I05W is one.
Other permits in the Bear Den Bay subwatershed (HUC 101101012004)
- MANDAREE INTAKE SITE IMPROVEMENTS, Mandaree: NDR10I06G, minor, term to 2027-02-16
- XA-SS-5-022(143)126 PCN: 23547, Mandaree: NDR10I05Y, minor, term to 2027-02-16
Nearby on the register
- Discharge permits in Mandaree
- Every permit record in Mandaree, A to Z
- Discharge permits in North Dakota
- Every permit record in North Dakota, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The BIRD BEAR SITE permit, held by Mayo Construction Company, Inc., is one of 3 NPDES permits in the Bear Den Bay subwatershed and one of 10 storm water construction permits in Mandaree. Of the 6 storm water construction permits in Mandaree, 33.3% were issued earlier than this one, and none of the 10 Mandaree storm water construction permits carries a violation on file.