NPDES NDR10I06X · Clean Water Act
26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION, Fort Totten, ND: NPDES NDR10I06X discharge permit, effluent exceedances, inspections, penalties
26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION, Fort Totten, North Dakota: General permit coverage NDR10I06X, held by Central Specialties, Inc.; Construction stormwater; Effective; issued July 30, 2026, term to February 16, 2027, by U.S. EPA.
North Dakota holds 2,244 Construction stormwater coverages of this permit type in EPA’s file; 2,135 were issued before NDR10I06X. Central Specialties, Inc. holds 8 permits in North Dakota.
Other permits held by Central Specialties, Inc.
- SIOUX CO ND: RAISE GRANT CONST PROJ. BIA 6 & BIA 3, Selfridge: NDR10I05G, issued 2024-05-23
- 25082 - PROJECT HLC-0003(023) PCN #22923, St Michael: NDR10I067, issued 2025-07-15
- CENTRAL SPECIALTIES, INC.: NDR110167, issued 2015-03-31
- CENTRAL SPECIALTIES, INC.: NDR110169, issued 2015-03-31
- CENTRAL SPECIALTIES, INC.: NDR110301, issued 2015-03-31
- CENTRAL SPECIALTIES, INC., (Unknown City): NDR112876, issued 2020-03-30
- AIG NO. 3-38-0068-023-2024 & AIP NO. 3-38-0068-024-2024 CSI 24014, (Unknown City): NDR112953, issued 2020-03-30
Coverages issued nearest NDR10I06X
- 2026-07-28: VETERANS SQUARE APARTMENTS, Fargo: NDR114155, held by Rory Waliser
- 2026-07-28: NDDOT 23341, Fargo: NDR114156, held by thomas martin
- 2026-07-29: 26046 RENVILLE COUNTY PCN-23973, Alexandria: NDR114157, held by Alex Thompson
- 2026-07-29: CITY OF FARGO – STORMWATER CONSTRUCTION, Fargo: NDR114158, held by Zachary Iverson
- 2026-07-29: 24811 - N OF NIAGARA - PIPE REPLACEMENT (HWY 32), Oslo: NDR114159, held by Erika Martesn
- 2026-07-30: 32ND STREET NW GRAVEL RECONSTRUCTION (MCKG26001), Watford City: NDR114160, held by Grace Demars
- 2026-07-30: DICKEY CO. 2 MILES NORTH OF OAKES, ND, Oakes: NDR114161, held by Isaac Anderson
- 2026-07-31: PENNINGTON BORROW, Dickinson: NDR114162, held by Tim Maul
- 2026-07-31: STARK CO. 30TH ST, Dickinson: NDR114163, held by JOEL FICEK
- 2026-08-03: GRAFTON HEC-0050(056) WALSH COUNTY, Grafton: NDR114164, held by Lynn Meyer
26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION among its neighbors
8 discharge permits are in the Town of Fort Totten-Devils Lake subwatershed (HUC 090202011203); NDR10I06X is one.
Other permits in the Town of Fort Totten-Devils Lake subwatershed (HUC 090202011203)
- CAMP GRAFTON NORTH EQUIPMENT TRAINING SITE, Devils Lake: NDR101503, minor, term to 2025-03-31
- FORT TOTTEN LIFT STATION REPLACEMENT, Minnewaukan: NDR10I03Y, minor, term to 2027-02-16
- FOUR WINDS TATE TOPA TRIBAL SCHOOL LAGOON, Fort Totten: NDG589206, minor, term to 2020-12-31
- NDARNG CAMP GRAFTON NORTH, Devils Lake: NDR050880, minor, term to 2030-03-31
- SPIRIT LAKE HEALTH CLINIC, Fort Totten: NDR10I06K, minor, term to 2027-02-16
- SPIRIT LAKE REPOSITORY BUILDING, Fort Totten: NDR10I06F
- WEST ACRES WASTEWATER TREATMENT LAGOON, Fort Totten: NDG589201, minor, term to 2020-12-31
What stands out
- Its term runs 201 days, July 30, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,594 discharge permits on the register in North Dakota; 2,244 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION |
|---|---|
| Permittee | Central Specialties, Inc. |
| NPDES ID | NDR10I06X |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 30, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Fort Totten, ND 58335 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Town of Fort Totten-Devils Lake (HUC 090202011203) |
NPDES NDR10I06X: effluent limits and exceedances
26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION (NPDES NDR10I06X): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NDR10I06X: no pollutant row on file.
NPDES NDR10I06X: inspections, violations and enforcement
NPDES NDR10I06X (26069 FORT TOTTEN PATHWAY RECONSTRUCTION SPIRIT LAKE NATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NDR10I06X
NPDES NDR10I06X: one email when its EPA record changes — $99/month.
Permits near NPDES NDR10I06X
NPDES NDR10I06X: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.