NPDES NDR112115 · Clean Water Act
GRAND FORKS REGIONAL AIRPORT, Grand Forks, ND: NPDES NDR112115 discharge permit, effluent exceedances, inspections, penalties
GRAND FORKS REGIONAL AIRPORT, Grand Forks, North Dakota: General permit coverage NDR112115, held by Grand Forks Regional Airport Authority; Construction stormwater; Administratively continued; issued March 30, 2020, term to March 31, 2025, by North Dakota Department of Environmental Quality.
North Dakota holds 2,244 Construction stormwater coverages of this permit type in EPA’s file; 584 were issued before NDR112115.
Coverages issued nearest NDR112115
- 2020-03-30: NATIONAL PARK SERVICE: NDR112087, held by National Park Service
- 2020-03-30: MOUNTRAIL COUNTY: NDR112097, held by Mountrail County
- 2020-03-30: HOHENSTEIN HOMES: NDR112103, held by Hohenstein Homes
- 2020-03-30: JAMES AND KELSI HACH: NDR112107, held by James and Kelsi Hach
- 2020-03-30: BASIN ELECTRIC POWER COOPERATIVE, (Unknown City): NDR112113, held by Basin Electric Power Cooperative
- 2020-03-30: HAWTHORNE CUSTOM HOMES: NDR112116, held by Hawthorne Custom Homes
- 2020-03-30: U.S. ARMY CORPS OF ENGINEERS-OMAHA - PIPESTEM SPILLWAY MODIFICATION PROJECT, Jamestown: NDR112128, held by U.S. Army Corps of Engineers - Omaha
- 2020-03-30: CITY OF HORACE - ARROWWOOD THIRD ADDITION, Horace: NDR112134, held by City of Horace
- 2020-03-30: JEFFREY MISTELSKI: NDR112136, held by Pro Marine
- 2020-03-30: BOTTINEAU COUNTY - STORMWATER CONSTRUCTION, Bottineau: NDR112144, held by Bottineau County
GRAND FORKS REGIONAL AIRPORT among its neighbors
9 discharge permits are in the Salt Water Coulee subwatershed (HUC 090203070304); NDR112115 is one. Its county: 169, 2 major; NDR112115 is minor permit.
Other permits in the Salt Water Coulee subwatershed (HUC 090203070304)
- EMERADO CITY OF, Emerado: NDG221971, minor, term to 2024-03-31
- GF AIRPORT - RECONSTRUCT 17R/35L, (Unknown City): NDR114079, minor, term to 2030-03-31
- GRAND FORKS AIR FORCE BASE HWY2 WATER TRANSMISSION MAIN, Minot Afb: NDR114098, minor, term to 2030-03-31
- GRAND FORKS AIR TRAFFIC CONTROL TOWER, Grand Forks: NDR114150, minor, term to 2030-03-31
- GRAND FORKS INTERNATIONAL AIRPORT, Grand Forks: NDR050338, minor, term to 2025-03-31
- GRAND FORKS INTERNATIONAL AIRPORT, (Unknown City): NDR112531, minor, term to 2025-03-31
- STEFFES METAL PRODUCTS, LLC - GRAND FORKS WEST, Grand Forks: NDR050891, minor, term to 2030-03-31
- UND FLIGHT OPERATIONS BUILDING, Grand Forks: NDR113324, minor, term to 2030-03-31
What stands out
- Its term runs 5 years and 1 day, March 30, 2020 to March 31, 2025; the term ended 533 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,594 discharge permits on the register in North Dakota; 2,244 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GRAND FORKS REGIONAL AIRPORT |
|---|---|
| Permittee | Grand Forks Regional Airport Authority |
| NPDES ID | NDR112115 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 30, 2020 |
| Expires | March 31, 2025 |
| Agency | North Dakota Department of Environmental Quality |
| Address | Grand Forks, ND 58203 |
| Subwatershed | Salt Water Coulee (HUC 090203070304) |
NPDES NDR112115: effluent limits and exceedances
GRAND FORKS REGIONAL AIRPORT (NPDES NDR112115): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NDR112115: no pollutant row on file.
NPDES NDR112115: inspections, violations and enforcement
NPDES NDR112115 (GRAND FORKS REGIONAL AIRPORT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NDR112115
NPDES NDR112115: one email when its EPA record changes — $99/month.
Permits near NPDES NDR112115
NPDES NDR112115: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.