NPDES 01R10I01L · Clean Water Act
NORTH END MIXED USE DEVELOPMENT, Portsmouth, NH: NPDES 01R10I01L discharge permit, effluent exceedances, inspections, penalties
NORTH END MIXED USE DEVELOPMENT, Portsmouth, New Hampshire: General permit coverage 01R10I01L, held by PH Condo Dev, LLC; Construction stormwater; Effective; issued June 19, 2025, term to February 16, 2027, by U.S. EPA.
New Hampshire holds 1,239 Construction stormwater coverages of this permit type in EPA’s file; 823 were issued before 01R10I01L.
Coverages issued nearest 01R10I01L
- 2025-06-13: UNION STREET PARKING LOT, Rochester: 01R10I01H, held by S.U.R. Construction Inc
- 2025-06-13: MICROSPEC NORTH PIT, Peterborough: 01R10I01I, held by JCK Sand & Gravel
- 2025-06-15: WINNISQUAM VILLAGE CONDOMINIUMS, Tilton: 01R10I018, held by JAL Winnisquam Development, LLC
- 2025-06-16: MAJOR SUBDIVISION FOR ROBERT L. DIBERTO, MITCHELL ROAD, NOTTINGHAM, Nottingham: 01R10I01J, held by Robert L. Diberto
- 2025-06-19: LILAC STATE SOLAR PROJECT, Farmington: 01R10I01K, held by Walden Renewables
- 2025-06-22: THE NICK - WOLFEBORO NH, Wolfeboro: 01R10I01N, held by Milestone Construction LLC
- 2025-06-23: ENCORE WARNER SOLAR, Warner: 01R10I01O, held by Encore Renewable Energy
- 2025-06-24: NORTH END MIXED USE DEVELOPMENT, Portsmouth: 01R10I01Q, held by Dellbrook JKS
- 2025-06-24: LILAC STATE SOLAR PROJECT, Farmington: 01R10I01R, held by Louth Callan Renewables
- 2025-06-25: BEK MEADOWS SUBDIVISION, Jefferson: 01R10I01M, held by Hicks Logging, LLC
NORTH END MIXED USE DEVELOPMENT among its neighbors
95 discharge permits are in the Portsmouth Harbor subwatershed (HUC 010600031001); 01R10I01L is one.
Other permits in the Portsmouth Harbor subwatershed (HUC 010600031001)
- 100 DURGIN LANE, Portsmouth: 01R10I044, minor, term to 2027-02-16
- 100 DURGIN LANE, Portsmouth: 01R10I045, minor, term to 2027-02-16
- 100 NEW HAMPSHIRE AVENUE, Portsmouth: NHR1001US, minor, term to 2027-02-16
- 100 NEW HAMPSHIRE AVENUE, Portsmouth: NHR1001UT, minor, term to 2027-02-16
- 105 BARTLETT STREET - MULTIFAMILY DEVELOPMENT, Portsmouth: NHR10020X, minor, term to 2027-02-16
- 105 BARTLETT STREET - MULTIFAMILY DEVELOPMENT, Portsmouth: NHR10021B, minor, term to 2027-02-16
- 200 CHASE DRIVE, Portsmouth: NHR100247, minor, term to 2027-02-16
- 2021 E194, U181, & 3135 TRANSMISSION LINE STRUCTURE REPLACEMENT, Portsmouth: NHR1001F9, minor, term to 2027-02-16
- 2021 E194, U181, & 3135 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Portsmouth: NHR1001EG, minor, term to 2022-02-15
- 282 CORPORATE DRIVE, Portsmouth: 01R10I02P, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 242 days, June 19, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 1,239 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NORTH END MIXED USE DEVELOPMENT |
|---|---|
| Permittee | PH Condo Dev, LLC |
| NPDES ID | 01R10I01L |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 19, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Portsmouth, NH 03801 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Portsmouth Harbor (HUC 010600031001) |
NPDES 01R10I01L: effluent limits and exceedances
NORTH END MIXED USE DEVELOPMENT (NPDES 01R10I01L): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES 01R10I01L: no pollutant row on file.
NPDES 01R10I01L: inspections, violations and enforcement
NPDES 01R10I01L (NORTH END MIXED USE DEVELOPMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES 01R10I01L
NPDES 01R10I01L: one email when its EPA record changes — $99/month.
Permits near NPDES 01R10I01L
NPDES 01R10I01L: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.