NPDES 01R10I03L · Clean Water Act
TAXIWAY A RECONSTRUCTION, Keene, NH: NPDES 01R10I03L discharge permit, effluent exceedances, inspections, penalties
TAXIWAY A RECONSTRUCTION, Keene, New Hampshire: General permit coverage 01R10I03L, held by Casella Construction, Inc.; Construction stormwater; Effective; issued September 10, 2025, term to February 16, 2027, by U.S. EPA.
New Hampshire holds 1,239 Construction stormwater coverages of this permit type in EPA’s file; 881 were issued before 01R10I03L.
Coverages issued nearest 01R10I03L
- 2025-09-01: NEWINGTON DFSP BUNKER TANK DEMOLITION, Newington: 01R10I037, held by CMS Corporation
- 2025-09-02: WITTNER'S RUN RESIDENTIAL DEVELOPMENT, Barrington: 01R10I03B, held by Chinburg Properties
- 2025-09-04: PARK AND WHITTEMORE INFRASTRUCTURE IMPROVEMENTS, Hillsborough: 01R10I033, held by Park Construction, Inc.
- 2025-09-04: HIGHLAND, EMERSON, AND RESERVOIR WATER & SEWER IMPROVEMENTS PROJECT, Plymouth: 01R10I03I, held by N. Granese & Sons, Inc.
- 2025-09-09: TOWN OF PETERBOROUGH FIRE AND AMBULANCE FACILITY, Peterborough: 01R10I024, held by Accura Construction Corp
- 2025-09-12: TOWN OF SWANZEY - CALIFORNIA AND NORTH WINCHESTER STREET RECONSTRUCTION, Swanzey: 01R10I02G, held by J. Evans Construction Inc.
- 2025-09-12: BALLARD TRUCK CENTER, Bow: 01R10I03J, held by Ballard Realty of NH LLC
- 2025-09-12: RICK WENZEL OIL COMPANY, Auburn: 01R10I03M, held by Kevin J. Grassett Excavation, LLC
- 2025-09-16: MOHAWK TANNERY REDEVELOPMENT, Nashua: 01R10I03K, held by Thorndike Development, Corp.
- 2025-09-17: COMMERCIAL SITE PLANS FOR TMS DIESEL, Goffstown: 01R10I03N, held by TMS Tower Hill Holdings, LLC
TAXIWAY A RECONSTRUCTION among its neighbors
21 discharge permits are in the Ash Swamp Brook-Ashuelot River subwatershed (HUC 010802010301); 01R10I03L is one.
Other permits in the Ash Swamp Brook-Ashuelot River subwatershed (HUC 010802010301)
- 2021 D108 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Keene: NHR1001B3, minor, term to 2022-02-15
- 2022 T198 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Keene: NHR1001ET, minor, term to 2022-02-15
- 603 OPTX, LLC, Keene: NHNOEJ04V, minor, term to 2030-10-16
- AMETEK PRECITECH, INC., Keene: NHNOEJ03X, minor, term to 2029-01-24
- C&S AVIATION SERVICES, Keene: NHR053066, minor, term to 2020-06-03
- CORNING NETOPTIX, INC, Keene: NHNOE3309, minor, term to 2026-08-24
- EVERSOURCE NORTH KEENE SUBSTATION, Keene: NHR1001QK, minor, term to 2027-02-16
- FAIRFIELD KIA OF KEENE, Keene: 01R10I05E, minor, term to 2027-02-16
- G.S. PRECISION, Keene: NHNOEJ01J, minor, term to 2025-11-23
- ICU MEDICAL - KEENE, Keene, Nh: NHNOEJ043, minor, term to 2029-07-02
What stands out
- Its term runs 1 year and 159 days, September 10, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 1,239 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TAXIWAY A RECONSTRUCTION |
|---|---|
| Permittee | Casella Construction, Inc. |
| NPDES ID | 01R10I03L |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 10, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Keene, NH 03431 |
| Subwatershed | Ash Swamp Brook-Ashuelot River (HUC 010802010301) |
NPDES 01R10I03L: effluent limits and exceedances
TAXIWAY A RECONSTRUCTION (NPDES 01R10I03L): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES 01R10I03L: no pollutant row on file.
NPDES 01R10I03L: inspections, violations and enforcement
NPDES 01R10I03L (TAXIWAY A RECONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES 01R10I03L
NPDES 01R10I03L: one email when its EPA record changes — $99/month.
Permits near NPDES 01R10I03L
NPDES 01R10I03L: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.