NPDES NHG58C421 · Clean Water Act
LANDAFF COLLECTION SYSTEM, Lisbon, NH: NPDES NHG58C421 discharge permit, effluent exceedances, inspections, penalties
LANDAFF COLLECTION SYSTEM, Lisbon, New Hampshire: General permit coverage NHG58C421; Publicly owned treatment works; Effective; issued December 1, 2021, term to November 30, 2026; discharges to AMMONOOSUC RIVER.
- Report due [yrmoda]: 1 limit, 2 violations of any kind.
New Hampshire holds 26 Publicly owned treatment works coverages of this permit type in EPA’s file; 14 were issued before NHG58C421.
Coverages issued nearest NHG58C421
- 2021-12-01: PETERBOROUGH WASTEWATER TREATMENT PLANT, Peterborough: NHG580019, held by PETERBOROUGH W W T F
- 2021-12-01: WOODSTOCK W W T P, North Woodstock: NHG580020, held by WOODSTOCK WASTEWATER TREATMENT PLANT
- 2021-12-01: PITTSFIELD WASTEWATER TREATMENT FACILITY, Pittsfield: NHG580022, held by PITTSFIELD W W T F
- 2021-12-01: FARMINGTON WWTP, Farmington: NHG580023, held by FARMINGTON W W T P
- 2021-12-01: NEW LONDOND COLLECTION SYSTEM, Sunapee: NHG58C117, held by NEW LONDON SEWER COLLECTION
LANDAFF COLLECTION SYSTEM among its neighbors
3 discharge permits are in the Pearl Lake Brook-Ammonoosuc River subwatershed (HUC 010801030503); NHG58C421 is one. Its county: 71, 5 major; NHG58C421 is minor permit.
Other permits in the Pearl Lake Brook-Ammonoosuc River subwatershed (HUC 010801030503)
- NEW ENGLAND WIRE - LITTLETON INC., 2023 ADDITION, Lisbon: NHR1001U0, minor, term to 2027-02-16
- NEW ENGLAND WIRE TECHNOLOGIES, Lisbon: NHR05A520, minor, term to 2005-10-29
What stands out
- Its term runs 4 years and 364 days, December 1, 2021 to November 30, 2026.
- No dated event in the 365 days to October 14, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 74 of them (3.7%) are in its program, Publicly owned treatment works, and it is a minor discharger.
Identity
| Facility | LANDAFF COLLECTION SYSTEM |
|---|---|
| Permittee | LANDAFF COLLECTION SYSTEM |
| NPDES ID | NHG58C421 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Publicly owned treatment works |
| Program | Publicly owned treatment works |
| Issued | December 1, 2021 |
| Expires | November 30, 2026 |
| Address | Lisbon, NH 03585 |
| Receiving water | AMMONOOSUC RIVER |
| Subwatershed | Pearl Lake Brook-Ammonoosuc River (HUC 010801030503) |
NPDES NHG58C421: effluent limits and exceedances
LANDAFF COLLECTION SYSTEM (NPDES NHG58C421): 1 pollutants on file, 1 limited; 1 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Report due [yrmoda] | 1 | 2 | 0 |
NPDES NHG58C421: inspections, violations and enforcement
NPDES NHG58C421 (LANDAFF COLLECTION SYSTEM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NHG58C421
NPDES NHG58C421: one email when its EPA record changes — $99/month.
Permits near NPDES NHG58C421
NPDES NHG58C421: 1 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.