NPDES NHNOEJ01V · Clean Water Act
FUJIFILM DIMATIX 109, Lebanon, NH: NPDES NHNOEJ01V discharge permit, effluent exceedances, inspections, penalties
FUJIFILM DIMATIX 109, Lebanon, New Hampshire: General permit coverage NHNOEJ01V, held by Fujifilm Dimatix; Industrial stormwater; Effective; issued May 3, 2021, term to May 3, 2026, by U.S. EPA.
New Hampshire holds 310 Industrial stormwater coverages of this permit type in EPA’s file; 175 were issued before NHNOEJ01V. Fujifilm Dimatix holds 3 permits in New Hampshire.
Other permits held by Fujifilm Dimatix
- FUJIFILM DIMATIX 101, Lebanon: NHNOEJ01U, issued 2021-05-03
- FUJIFILM DIMATIX FIIS, Lebanon: NHNOEJ01W, issued 2021-05-03
Coverages issued nearest NHNOEJ01V
- 2021-04-15: BAE SYSTEMS, Londonderry: NHNOE3278, held by BAE SYSTEMS IESI INC.
- 2021-04-15: BAE SYSTEMS, Nashua: NHNOE3279, held by BAE SYSTEMS IESI INC.
- 2021-04-23: BRAZONICS, INC., Hampton: NHNOEJ01S, held by Brazonics, Inc.
- 2021-04-23: MARMON UTILITY, LLC, Amherst: NHNOEJ01T, held by Hendrix Molded Products
- 2021-05-03: FUJIFILM DIMATIX 101, Lebanon: NHNOEJ01U, held by Fujifilm Dimatix
- 2021-05-03: FUJIFILM DIMATIX FIIS, Lebanon: NHNOEJ01W, held by Fujifilm Dimatix
- 2021-05-05: RENEWABLE FUELS BY PETERSON, LLC, North Haverhill: NHNOEJ01X, held by Renewable Fuels by Peterson, LLC
- 2021-05-05: NORTH WATER MARINE, Laconia: NHNOEJ01Y, held by North Water Marine, LLC
- 2021-05-06: HP HOOD LLC, Concord: NHNOE3031, held by HP Hood LLC
- 2021-05-06: JAFFREY WASTEWATER TREATMENT FACILITY, Jaffrey: NHNOEJ01Z, held by Suez Group
FUJIFILM DIMATIX 109 among its neighbors
29 discharge permits are in the Mascoma River subwatershed (HUC 010801060106); NHNOEJ01V is one.
Other permits in the Mascoma River subwatershed (HUC 010801060106)
- 369 MIRACAL MILE CHARITABLE GAMING/RESTAURANT, Lebanon: NHR1001VP, minor, term to 2027-02-16
- 369 MIRACLE MILE CHARITY GAMING/RESTAURANT, Lebanon: NHR1001VO, minor, term to 2027-02-16
- 82 BENNING STREET BLDG 4, West Lebanon: NHNOEJ04Q, minor, term to 2030-06-02
- 92 RIVERSIDE DRIVE, Lebanon: NHR1001XK, minor, term to 2027-02-16
- ALL WASTE TRANSFER STATION, Lebanon: NHNOE3030, minor, term to 2026-03-08
- CITY OF LEBANON - MECHANIC, HIGH, MASCOMA STREET INTERSECTION, Lebanon: NHR10028X, minor, term to 2027-02-16
- ESAB / THERMAL DYNAMICS, West Lebanon: NHNOE3266, minor, term to 2021-01-26
- FUJIFILM DIMATIX 101, Lebanon: NHNOEJ01U, minor, term to 2026-05-03
- GREEN MOUNTAIN POWER GLEN (MASCOMA) HYDROELECTRIC PROJECT, W. Lebanon: NHG360024, minor, term to 2014-12-31
- HYPERTHERM, INC., Lebanon: NHNOE3224, minor, term to 2026-01-27
What stands out
- Its term runs 5 years, May 3, 2021 to May 3, 2026; the term ended 135 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 313 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | FUJIFILM DIMATIX 109 |
|---|---|
| Permittee | Fujifilm Dimatix |
| NPDES ID | NHNOEJ01V |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | May 3, 2021 |
| Expires | May 3, 2026 |
| Agency | U.S. EPA |
| Address | Lebanon, NH 03766 |
| Subwatershed | Mascoma River (HUC 010801060106) |
NPDES NHNOEJ01V: effluent limits and exceedances
FUJIFILM DIMATIX 109 (NPDES NHNOEJ01V): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NHNOEJ01V: no pollutant row on file.
NPDES NHNOEJ01V: inspections, violations and enforcement
NPDES NHNOEJ01V (FUJIFILM DIMATIX 109): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NHNOEJ01V
NPDES NHNOEJ01V: one email when its EPA record changes — $99/month.
Permits near NPDES NHNOEJ01V
NPDES NHNOEJ01V: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.