NPDES NHR1001DF · Clean Water Act

2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Dover, NH: NPDES NHR1001DF discharge permit, effluent exceedances, inspections, penalties

2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Dover, New Hampshire: General permit coverage NHR1001DF, held by Eversource; Construction stormwater; Administratively continued; issued November 21, 2021, term to February 15, 2022, by U.S. EPA.

New Hampshire holds 1,239 Construction stormwater coverages of this permit type in EPA’s file; 149 were issued before NHR1001DF. Eversource holds 3 permits in New Hampshire.

Other permits held by Eversource

Coverages issued nearest NHR1001DF

2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT among its neighbors

23 discharge permits are in the Oyster River subwatershed (HUC 010600030902); NHR1001DF is one.

Other permits in the Oyster River subwatershed (HUC 010600030902)

What stands out

  • Its term runs 86 days, November 21, 2021 to February 15, 2022; the term ended 1,702 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to October 14, 2026.
  • It is one of 1,994 discharge permits on the register in New Hampshire; 1,239 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT
PermitteeEversource
NPDES IDNHR1001DF
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedNovember 21, 2021
ExpiresFebruary 15, 2022
AgencyU.S. EPA
AddressDover, NH 03820
Receiving water impaired303(D) Listed
SubwatershedOyster River (HUC 010600030902)

NPDES NHR1001DF: effluent limits and exceedances

2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT (NPDES NHR1001DF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES NHR1001DF: no pollutant row on file.

NPDES NHR1001DF: inspections, violations and enforcement

NPDES NHR1001DF (2021 M183 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES NHR1001DF

NPDES NHR1001DF: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES NHR1001DF

NPDES NHR1001DF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.