NPDES NHR1002AB · Clean Water Act
VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE, Londonderry, NH: NPDES NHR1002AB discharge permit, effluent exceedances, inspections, penalties
VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE, Londonderry, New Hampshire: General permit coverage NHR1002AB, held by North Branch Construction; Construction stormwater; Effective; issued June 24, 2026, term to February 16, 2027, by U.S. EPA.
New Hampshire holds 1,239 Construction stormwater coverages of this permit type in EPA’s file; 1,138 were issued before NHR1002AB. North Branch Construction holds 9 permits in New Hampshire.
Other permits held by North Branch Construction
- ENVISION BUILDING, Londonderry: 01R10I05H, issued 2025-11-05
- MAYNARD HOMES REDEVELOPMENT PHASE 1, Nashua: 01R10I06U, issued 2025-12-25
- LIMESTONE HILLS, Amherst: NHR1001OM, issued 2023-02-06
- SIG SAUER ROCHESTER, Rochester: NHR1001UV, issued 2023-10-10
- VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE, Londonderry: NHR10022G, issued 2024-08-30
- RIVIER UNIVERSITY VILLAGE STUDENT HOUSING - PHASE 2, Nashua: NHR10022L, issued 2024-09-09
- VILLAGE ON TECHNOLOGY HILL - RETAIL CHILDCARE, Londonderry: NHR10025G, issued 2025-02-03
- ONPOINT AND LIGHT MANUFACTURING BUILDINGS, Londonderry: NHR10025Z, issued 2025-02-26
Coverages issued nearest NHR1002AB
- 2026-06-17: COLEMAN - RTE. 16 - OSSIPEE, Ossipee: NHR1002AO, held by A.J. Coleman & Son, Inc.
- 2026-06-18: MCFARLAND KIA - 41 PORTSMOUTH AVENUE, STRATHAM, NH, Stratham: NHR1002AQ, held by 41 Portsmouth Ave LLC
- 2026-06-18: FORMER ALLIED TANNERY SITE / 36-38, 40-46, 48-56 COMMERCIAL STREET, Boscowen: NHR1002AR, held by Green Site Services Group, Inc.
- 2026-06-19: BRENTWOOD MANUFACTURING FACILITY, Brentwood: NHR1002AS, held by Rick Hartmann
- 2026-06-23: PROPOSED ATHLETIC FIELD COMPLEX, Nashua: NHR1002AT, held by Brothers of the Sacred Heart of New England, Inc
- 2026-06-24: BANKS CHEVROLET PARKING LOT RESTORATION, Concord: NHR1002AU, held by Weaver Bros. Construction Company, Inc.
- 2026-06-26: KEARSARGE OLD MILL SOLAR, Stratford: NHR1002AX, held by Optimum EPC, LLC
- 2026-06-26: OVERLOOK DRIVE SOLAR, Andowver: NHR1002AY, held by VCP EPC, LLC
- 2026-06-29: 56 OLD DERRY ROAD, Derry: NHR1002AZ, held by American Excavating Corp.
- 2026-07-01: B143 LINE ASSET CONDITION REPLACEMENT, Goffstown: NHR1002B0, held by Harlan Electric Company, Inc.
VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE among its neighbors
62 discharge permits are in the Little Cohas Brook-Merrimack River subwatershed (HUC 010700060804); NHR1002AB is one.
Other permits in the Little Cohas Brook-Merrimack River subwatershed (HUC 010700060804)
- 19 HARVEY ROAD - LSNE, INC., DBA PCI PHARMACEUTICAL SERVICES, Bedford: NHNOEJ03K, minor, term to 2028-03-13
- 220 ROCKINGHAM ROAD, Londonderry: NHR10029X, minor, term to 2027-02-16
- 29 HARVEY ROAD - LSNE, INC., DBA PCI PHARMACEUTICAL SERVICES, Bedford: NHNOEJ03L, minor, term to 2028-03-13
- 29A COMMERCE DRIVE - LSNE, INC., DBA PCI PHARMACEUTICAL SERVICES, Bedford: NHNOEJ03M, minor, term to 2028-03-13
- 3 AKIRA WAY, Londonderry: NHR1001LN, minor, term to 2027-02-16
- 6 ROUNDSTONE DRIVE, Londonderry: NHR10028I, minor, term to 2027-02-16
- 6 ROUNDSTONE DRIVE, Londonderry: NHR10028R, minor, term to 2027-02-16
- 60 PETTENGILL ROAD, Londonderry: NHR10025Q, minor, term to 2027-02-16
- 734 INDUSTRIAL SITE PLAN, Merrimack: 01R10I01S, minor, term to 2027-02-16
- ABF FREIGHT SYSTEM, INC., Londonderry: NHNOE0007, minor, term to 2023-05-17
What stands out
- Its term runs 237 days, June 24, 2026 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 1,239 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE |
|---|---|
| Permittee | North Branch Construction |
| NPDES ID | NHR1002AB |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 24, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Londonderry, NH 03053 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Little Cohas Brook-Merrimack River (HUC 010700060804) |
NPDES NHR1002AB: effluent limits and exceedances
VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE (NPDES NHR1002AB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NHR1002AB: no pollutant row on file.
NPDES NHR1002AB: inspections, violations and enforcement
NPDES NHR1002AB (VILLAGE ON TECHNOLOGY HILL - INFRASTRUCTURE ADDITIONAL PHASE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NHR1002AB
NPDES NHR1002AB: one email when its EPA record changes — $99/month.
Permits near NPDES NHR1002AB
NPDES NHR1002AB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.