NPDES NHR1002B3 · Clean Water Act
WEGLARZ SOLAR FARM, Franklin, NH: NPDES NHR1002B3 discharge permit, effluent exceedances, inspections, penalties
WEGLARZ SOLAR FARM, Franklin, New Hampshire: General permit coverage NHR1002B3, held by VCP EPC, LLC; Construction stormwater; Effective; issued July 27, 2026, term to February 16, 2027, by U.S. EPA.
New Hampshire holds 1,239 Construction stormwater coverages of this permit type in EPA’s file; 1,170 were issued before NHR1002B3. VCP EPC, LLC holds 2 permits in New Hampshire.
Other permits held by VCP EPC, LLC
- OVERLOOK DRIVE SOLAR, Andowver: NHR1002AY, issued 2026-06-26
Coverages issued nearest NHR1002B3
- 2026-07-22: #06030-1011 - WALMART DC TRUCK GATE RELOCATION, Raymond: NHR1002BO, held by Wal-Mart Stores East, LP
- 2026-07-23: M127 TRANSMISSION LINE STRUCTURE REPLACEMENT PROJECT, Multiple: NHR1002BP, held by Michels Power Inc
- 2026-07-23: KEARSARGE CLAREMONT SOLAR, Claremont: NHR1002BQ, held by Legacy Power, LLC
- 2026-07-24: ST. HILAIRE MOTORSPORTS EXPANSION, Barrington: NHR1002BK, held by Josh St. Hilaire
- 2026-07-24: KEARSARGE PLAINFIELD SOLAR, Plainfield: NHR1002BR, held by Legacy Power, LLC
- 2026-07-27: FARMINGTON WATER SYSTEM IMPROVEMENTS, Farmington: NHR1002BD, held by Northeast Earth Mechanics, LLC
- 2026-07-27: GOSHEN SOLAR PROJECT, Goshen: NHR1002BS, held by Optimum EPC, LLC
- 2026-07-28: LINE 367 ASSET CONDITION REPLACEMENT PROJECT, Fitzwilliam: NHR1002BT, held by M.J. Electric
- 2026-07-28: 370 NORTH BROADWAY - SITE PLAN PHASE 1, Salem: NHR1002BU, held by Jordan Transport, LLC
- 2026-07-29: L163 LINE MAINTENANCE PROJECT, Keene,Stoddard,Nelson,Antrim: NHR1002BV, held by Public Service Company of New Hampshire d/b/a Eversource Energy
WEGLARZ SOLAR FARM among its neighbors
9 discharge permits are in the Punch Brook-Merrimack River subwatershed (HUC 010700060101); NHR1002B3 is one.
Other permits in the Punch Brook-Merrimack River subwatershed (HUC 010700060101)
- EASTERSEALS NH MILITARY AND VETERANS CAMPUS, Franklin: NHR100299, minor, term to 2027-02-16
- FRANKLIN DISTRIBUTION CENTER, Franklin: NHNOEJ030, minor, term to 2027-08-05
- FRANKLIN SECURE RESIDUE LANDFILL, Franklin: NHNOEJ01N, minor, term to 2026-03-13
- FRANKLIN WASTEWATER TREATMENT PLANT, Franklin: NHR05BN29
- NH-DES WRBP, Franklin: NHNOE3212, minor, term to 2025-08-19
- PCC STRUCTURALS, INC. - FRANKLIN, Franklin: NHNOEJ02Q, minor, term to 2027-04-11
- WATTS REGULATOR CO., Franklin: NHR053074, minor, term to 2020-06-03
- WINNIPESAUKEE RIVER BASIN PROGRAM, Franklin: NH0100960, major, term to 2021-12-31
What stands out
- Its term runs 204 days, July 27, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,994 discharge permits on the register in New Hampshire; 1,239 of them (62%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WEGLARZ SOLAR FARM |
|---|---|
| Permittee | VCP EPC, LLC |
| NPDES ID | NHR1002B3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 27, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Franklin, NH 03235 |
| Subwatershed | Punch Brook-Merrimack River (HUC 010700060101) |
NPDES NHR1002B3: effluent limits and exceedances
WEGLARZ SOLAR FARM (NPDES NHR1002B3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NHR1002B3: no pollutant row on file.
NPDES NHR1002B3: inspections, violations and enforcement
NPDES NHR1002B3 (WEGLARZ SOLAR FARM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NHR1002B3
NPDES NHR1002B3: one email when its EPA record changes — $99/month.
Permits near NPDES NHR1002B3
NPDES NHR1002B3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.