NPDES AZR10I1AF · Clean Water Act
SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE, Shiprock, NM: NPDES AZR10I1AF discharge permit, effluent exceedances, inspections, penalties
SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE, Shiprock, New Mexico: General permit coverage AZR10I1AF, held by Savannah L. Begay; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Savannah L. Begay holds 25 permits in New Mexico.
Other permits held by Savannah L. Begay
- SR JOHN HOPKINS UNIVERSITY GAS CAPPING, Shiprock: AZR10I0YV
- FD TOHATCHI DETENTION CENTER GAS CAPPING, Tohatchi: AZR10I0ZL
- SR: SHIPROCK FAIRGROUNDS GAS MAIN REPAIR, Shprock: AZR10I11X
- NAPI GAS MAIN INSTALL, Farmington, Nm: AZR10I12X
- SR IHS GAS CAPPING AND RETIREMENT, Shiprock: AZR10I14I
- SR BIA GAS CAPPING AND RETIREMENT, Shiprock: AZR10I17J
- SR: SHIPROCK DISTRICT OFFICE GAS RE-ROUTE, Shiprock: AZR10I17Z
- CP: IHS HOUSING GAS CAPPING, Crownpoint: AZR10I18B
- CP STANDING ROCK SERVICE LINE RETIREMENT, Crownpoint: AZR10I18D
- SR: DINE COLLEGE MOBILE GAS MAIN CAPPING, Shiprock: AZR10I19N
SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I1AF is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE |
|---|---|
| Permittee | Savannah L. Begay |
| NPDES ID | AZR10I1AF |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I1AF: effluent limits and exceedances
SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE (NPDES AZR10I1AF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I1AF: no pollutant row on file.
NPDES AZR10I1AF: inspections, violations and enforcement
NPDES AZR10I1AF (SR: MICHAEL BENALLY GAS SERVICE LINE RE-ROUTE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I1AF
NPDES AZR10I1AF: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I1AF
NPDES AZR10I1AF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.