NPDES AZR10I1I6 · Clean Water Act
SR: 4 CORNERS CHURCH SL UPGRADE, Shiprock, NM: NPDES AZR10I1I6 discharge permit, effluent exceedances, inspections, penalties
SR: 4 CORNERS CHURCH SL UPGRADE, Shiprock, New Mexico: General permit coverage AZR10I1I6, held by Casey Robinson; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Casey Robinson holds 7 permits in New Mexico.
Other permits held by Casey Robinson
- SR: GAS SERVICE LINE RETIREMENT N. OF NNMC, Shiprock: AZR10I1GL
- SR: GAS LEAK N. OF CATHOLIC CHURCH REPAIR, Shiprock: AZR10I1GM
- SR: VALVE 170 & BARKER DOME UPGRADE, Shiprock: AZR10I1H2
- SR: GAS LEAK 1-INCH - KIRK CENTER, Shiprock: AZR10I1I5
- SR DINE COLLEGE METER RISER LEAK, Shiprock: AZR10I1JQ
- SR: FRANKLIN VILLAGE - HOUSE NEAR MAIN GAS LINE, Shiprock: AZR10I1JR
SR: 4 CORNERS CHURCH SL UPGRADE among its neighbors
87 discharge permits are in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704); AZR10I1I6 is one.
Other permits in the Rattlesnake Wash-San Juan River subwatershed (HUC 140801050704)
- (F79) SHIPROCK MEDICAL REFERRAL XVI, Shiprock: AZR10I0PK, minor, term to 2022-02-15
- (F94) SHIPROCK EAST SCATTERED XVII, Shiprock: AZR10I0OH, minor, term to 2022-02-15
- (G23) SHIPROCK EAST SCATTERED XVIII, Shiprock: AZR10I0VI, minor, term to 2027-02-16
- (G38) SHIPROCK MEDICAL REFERRALS, Shiprock: AZR10I160, minor, term to 2027-02-16
- (G40) SHIPROCK EAST SCATTERED XIX, Shiprock: AZR10I12H, minor, term to 2027-02-16
- (G52) SHIPROCK EAST SCATTERED HOUSING 2023, Shiprock: AZR10I17P, minor, term to 2027-02-16
- (LI7) SHIPROCK SU FAILED DRAINFIELDS, Shiprock: AZR10I0VH, minor, term to 2027-02-16
- (LJ6) SHIPROCK FARM AREA CISTERN, Shiprock: AZR10I0ZH
- (LM6) SHIPROCK FAILED DRAINFIELD SYSTEMS, Shiprock: AZR10I10G, minor, term to 2027-02-16
- (LM9) SHIPROCK SU FAILED SEPTIC SYSTEM DL2 DL3, Shiprock: AZR10I12I, minor, term to 2027-02-16
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | SR: 4 CORNERS CHURCH SL UPGRADE |
|---|---|
| Permittee | Casey Robinson |
| NPDES ID | AZR10I1I6 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Shiprock, NM 87420 |
| Subwatershed | Rattlesnake Wash-San Juan River (HUC 140801050704) |
NPDES AZR10I1I6: effluent limits and exceedances
SR: 4 CORNERS CHURCH SL UPGRADE (NPDES AZR10I1I6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I1I6: no pollutant row on file.
NPDES AZR10I1I6: inspections, violations and enforcement
NPDES AZR10I1I6 (SR: 4 CORNERS CHURCH SL UPGRADE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I1I6
NPDES AZR10I1I6: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I1I6
NPDES AZR10I1I6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.