NPDES NMR1002R7 · Clean Water Act
PARKHILL ESTATES PHASE 8A BORROW AREA, Las Cruces, NM: NPDES NMR1002R7 discharge permit, effluent exceedances, inspections, penalties
PARKHILL ESTATES PHASE 8A BORROW AREA, Las Cruces, New Mexico: General permit coverage NMR1002R7, held by Caliper Construction; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. Caliper Construction holds 10 permits in New Mexico.
Other permits held by Caliper Construction
- TULIP LANDFILL TIRE BALE WALL, Deming: NMR1000Y4
- GADSDEN INDEPENDENT SCHOOL DISTRICT PHYSICAL PLANT DEPT. PARKING LOT IMPROVEMENT, Anthony: NMR1001JW
- CASA DE ORO LIFT STATION & FORCE MAIN PROJECT, Las Cruces: NMR1001M9
- HYATT HOUSE HOTEL - CARLSBAD, Carlsbad: NMR1001YI
- SEWER LINE INSTALLATION PARKHILL SUBDIVISION PH 8, Las Cruces: NMR1002GT
- NEW WATER SUPPLY LINE TO US BORDER PATROL CHECK STATION, DOÑA ANA COUNTY, NM, Rincon, Nm: NMR1002YU
- UNIVERSITY MEADOWS SUBDIVISION PHASE 3-5, CALIPER, Las Cruces: NMR100475, issued 2021-09-21
- HEATHER HILLS SUBDIVISION, Las Cruces: NMR1007VX, issued 2026-05-01
- PEACHTREE HILLS ROAD MOONGATE WATERLINE, Las Cruces: NMR1007ZA, issued 2026-06-15
PARKHILL ESTATES PHASE 8A BORROW AREA among its neighbors
151 discharge permits are in the Box Canyon-Rio Grande subwatershed (HUC 130301020602); NMR1002R7 is one.
Other permits in the Box Canyon-Rio Grande subwatershed (HUC 130301020602)
- 230 HORSESHOE CIR, Las Cruces: NMR10080C, minor, term to 2027-02-16
- AIRCON SITE, Las Cruces: NMR10036K, minor, term to 2022-02-15
- ALLSUP'S #102507 LAS CRUCES, NM (BATAAN MEMORIAL), Las Cruces: NMR10073F, minor, term to 2027-02-16
- ALLSUP'S #102507 LAS CRUCES, NM (BATAAN MEMORIAL), Las Cruces: NMR10073I, minor, term to 2027-02-16
- ANIMAL SERVICE CENTER MESILLA VALLEY NEW ADOPTION CENTER, Las Cruces: NMR1003XP, minor, term to 2022-02-15
- ANIMAL SERVICE CENTER MESILLA VALLEY NEW ADOPTION CENTER, Las Cruces: NMR10040G, minor, term to 2022-02-15
- ARROYOS AT SETTLERS PASS SUBDIVISION - PHASE I, Las Cruces: NMR1004Y1, minor, term to 2027-02-16
- ARROYOS AT SETTLERS PASS SUBDIVISION - PHASE I, Las Cruces: NMR100514, minor, term to 2027-02-16
- BARNDO LANE ROAD IMPROVEMENT PROJECT, Las Cruces: NMR1002JZ
- BATAAN STORAGE UNITS, Las Cruces: NMR1004FW
What stands out
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | PARKHILL ESTATES PHASE 8A BORROW AREA |
|---|---|
| Permittee | Caliper Construction |
| NPDES ID | NMR1002R7 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Las Cruces, NM 88012 |
| Subwatershed | Box Canyon-Rio Grande (HUC 130301020602) |
NPDES NMR1002R7: effluent limits and exceedances
PARKHILL ESTATES PHASE 8A BORROW AREA (NPDES NMR1002R7): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1002R7: no pollutant row on file.
NPDES NMR1002R7: inspections, violations and enforcement
NPDES NMR1002R7 (PARKHILL ESTATES PHASE 8A BORROW AREA): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1002R7
NPDES NMR1002R7: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1002R7
NPDES NMR1002R7: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.