NPDES NMR1004EP · Clean Water Act
WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR, Rio Rancho, NM: NPDES NMR1004EP discharge permit, effluent exceedances, inspections, penalties
WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR, Rio Rancho, New Mexico: General permit coverage NMR1004EP, held by City of Rio Rancho NPDES; Construction stormwater; Administratively continued; issued January 3, 2022, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 511 were issued before NMR1004EP. City of Rio Rancho NPDES holds 12 permits in New Mexico.
Other permits held by City of Rio Rancho NPDES
- UNSER ROADWAY IMPROVEMENTS, Rio Rancho: NMR1001M3
- NORTHERN BOULEVARD RESTORATION - CORR PROJECT-PW1912, Rio Rancho: NMR10029Y
- COUNTRY CLUB DRIVE RECONSTRUCTION AND WATERLINE REPLACEMENT, Rio Rancho: NMR1002O8
- RIO RANCHO SPORTS COMPLEX EROSION CONTROL, Rio Rancho: NMR1002OY
- PW2061 - SOUTHERN BLVD RECONSTRUCTION, Rio Rancho: NMR1002SO
- LIFT STATION NO. 15 SANITARY SEWER FORCE MAIN, Rio Rancho: NMR1003MU
- RAINBOW BOULEVARD IMPROVEMENT PROJECT, Rio Rancho: NMR1004FB, issued 2022-01-17
- TULA DRIVE DRAINAGE IMPROVEMENTS PROJECT, Rio Rancho: NMR1004GG
- WESTSIDE BLVD BIKE AND PED PATH IMPROVEMENTS, Rio Rancho: NMR1004GH
- GRANDE RESTORATION PROJECT, Rio Rancho: NMR1005AU
Coverages issued nearest NMR1004EP
- 2022-01-03: SINGLE FAMILY HOME - 2805 GIRL SCOUT LN, Sunland Park: NMR1004EJ, held by Lenmark Construction Inc.
- 2022-01-03: VITAL CONSULTING GROUP, LLC TEMPORARY CONSTRUCTION YARD, Albuquerque: NMR1004EK, held by City of Albuquerque Aviation Department
- 2022-01-03: MIRAFLORES SUBIDIVISION, Santa Fe: NMR1004EL, held by Sparling Construction Company, Inc.
- 2022-01-03: SUNPORT WEST TERMINAL APRON RECONSTRUCTION, Albuquerque: NMR1004EM, held by City of Albuquerque Aviation Department
- 2022-01-03: SUNPORT AIR CARGO APRON EXPANSION, Albuquerque: NMR1004EN, held by City of Albuquerque Aviation Department
- 2022-01-04: #5 CAMINO ALAZAN, Santa Fe: NMR1004EQ, held by Hunter Custom Homes LLC
- 2022-01-04: CAPITOL FORD, Santa Fe: NMR1004ER, held by Lockwood Construction Company
- 2022-01-05: RAISING CANE' S #852 ALBUQUERQUE, NM, Albuquerque: NMR1004EV, held by Raising Cane's Restaurants, LLC
- 2022-01-06: SINGLE FAMILY HOME - 573 GOLDEN EAGLE, Chaparral: NMR1004EW, held by Lenmark Construction Inc.
- 2022-01-06: RAINBOW BLVD IMPROVEMENTS, Rio Rancho: NMR1004EX, held by Albuquerque Asphalt, Inc
WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR among its neighbors
11 discharge permits are in the Headwaters Arroyo de Las Calabacillas subwatershed (HUC 130202030105); NMR1004EP is one.
Other permits in the Headwaters Arroyo de Las Calabacillas subwatershed (HUC 130202030105)
- 10TH STREET NW TRANSMISSION LINE, Rio Rancho: NMR1002J6
- 3 MG RESERVOIR AND WELL 9 SITE IMPROVEMENTS, Rio Rancho: NMR1004EG, minor, term to 2022-02-15
- 509-609 2ND STREET NE RESIDENCES, Rio Rancho: NMR10063R, minor, term to 2027-02-16
- PROJECT RANGER, Rio Rancho: NMR1007JR, minor, term to 2027-02-16
- PROJECT RANGER, Rio Rancho: NMR1007JS, minor, term to 2027-02-16
- RIO RANCHO WELL 9R, Rio Rancho: NMR1005C5, minor, term to 2027-02-16
- SANDOVAL COUNTY SOLID WASTE REGIONAL CENTER, Rio Rancho: NMR100681, minor, term to 2027-02-16
- SSCAFCA THERMOPYLAE DIVERSION, Rio Rancho: NMR10080D, minor, term to 2027-02-16
- SSCAFCA THERMOPYLAE DIVERSION, Rio Rancho: NMR10080L, minor, term to 2027-02-16
- VERANDA 22 DISTRIBUTION REBUILD PHASE 1, Rio Rancho: NMR1007FJ
What stands out
- Its term runs 43 days, January 3, 2022 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR |
|---|---|
| Permittee | City of Rio Rancho NPDES |
| NPDES ID | NMR1004EP |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 3, 2022 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Rio Rancho, NM 87144 |
| Subwatershed | Headwaters Arroyo de Las Calabacillas (HUC 130202030105) |
NPDES NMR1004EP: effluent limits and exceedances
WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR (NPDES NMR1004EP): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1004EP: no pollutant row on file.
NPDES NMR1004EP: inspections, violations and enforcement
NPDES NMR1004EP (WELL NO. 9 IMPROVEMENTS AND 3 MG RESERVOIR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1004EP
NPDES NMR1004EP: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1004EP
NPDES NMR1004EP: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.