NPDES NMR1004FX · Clean Water Act
SANTA FE STUDIOS PHASE 1B & 2, Santa Fe, NM: NPDES NMR1004FX discharge permit, effluent exceedances, inspections, penalties
SANTA FE STUDIOS PHASE 1B & 2, Santa Fe, New Mexico: General permit coverage NMR1004FX, held by Klinger Constructors, LLC; Construction stormwater; Administratively continued; issued January 25, 2022, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 543 were issued before NMR1004FX. Klinger Constructors, LLC holds 5 permits in New Mexico.
Other permits held by Klinger Constructors, LLC
- LA SECOYA DE EL CASTILLO, Santa Fe: NMR1002JH
- LA SECOYA DE EL CASTILLO, Santa Fe: NMR1002L0, issued 2019-11-29
- SANTA MARIA DE LA VID ABBEY, Albuquerque: NMR1003YS, issued 2021-06-16
- WESTERN UNITED ELECTRICAL SUPPLY, Albuquerque: NMR1004H5, issued 2022-02-09
Coverages issued nearest NMR1004FX
- 2022-01-19: DUTCH BROTHERS COFFEE (NM0106), Albuquerque: NMR1004FM, held by Tanglewood Construction, Inc.
- 2022-01-20: CN 4101550, Las Vegas: NMR1004FO, held by New Mexico Department of Transportation District 4
- 2022-01-24: BEAGLE RESIDENCE, Santa Fe: NMR1004FS, held by Sol Terra Design + Build
- 2022-01-24: DUTCH BROTHERS COFFEE (NM0106), Albuquerque: NMR1004FT, held by Paseo del Norte DB, LLC
- 2022-01-24: SINGLE FAMILY HOME - 6120 LAZO DEL SUR, Las Cruces: NMR1004FU, held by Harmony Building LLC
- 2022-01-27: SINGLE FAMILY HOME - 4764 DULCINEA DRIVE, Las Cruces: NMR1004G4, held by JMS Construction
- 2022-01-27: SINGLE FAMILY HOME - 1855 TAPESTRY CIRCLE, Las Cruces: NMR1004G5, held by Casablanca Custom Homes
- 2022-01-27: CN6101091 NM 53 MP 15.500 TO MP 19.500, MCKINLEY COUNTY, Black Rock: NMR10I06J, held by Joe Cuilty
- 2022-01-28: WESTSIDE BLVD BIKE AND PED PATH IMPROVEMENTS, Rio Rancho: NMR1004G8, held by Star Paving Company
- 2022-01-28: THE VILLAGE AT CABEZON, Rio Rancho: NMR1004G9, held by Franklin's Earthmoving Inc.
SANTA FE STUDIOS PHASE 1B & 2 among its neighbors
11 discharge permits are in the Cienega River subwatershed (HUC 130202010105); NMR1004FX is one.
Other permits in the Cienega River subwatershed (HUC 130202010105)
- ABAJO LIFT STATION AND SEWERLINE, Santa Fe: NMR100805, minor, term to 2027-02-16
- DHSEM - SFMO FIRE TRAINING ACADEMY & MEMORIAL, Santa Fe: NMR1007TY, minor, term to 2027-02-16
- EAGLE RIDGE PHASE I, TASK 1, Santa Fe: NMR10I0AG, minor, term to 2027-02-16
- EAGLE RIDGE PHASE I, TASK 1, Santa Fe: NMR10I0AH, minor, term to 2027-02-16
- ESENCIA DE SANTA FE - TRACT 1, Santa Fe: NMR1006WM, minor, term to 2027-02-16
- ESENCIA PHASE 1A - BACKBONE INFRASTRUCTURE, Santa Fe: NMR1006Y4, minor, term to 2027-02-16
- ESENCIA TRACT 2, Santa Fe: NMR1006YN, minor, term to 2027-02-16
- NEW MEXICO DEPARTMENT OF PUBLIC SAFETY REALITY BASED TRAINING FACILITY, Santa Fe: NMR1007NN, minor, term to 2027-02-16
- NEW MEXICO DEPARTMENT OF PUBLIC SAFETY REALITY BASED TRAINING FACILITY, Santa Fe: NMR1007PM, minor, term to 2027-02-16
- VALLE VISTA WWTP, Santa Fe County: NM0028614, minor, term to 2009-08-31
What stands out
- Its term runs 21 days, January 25, 2022 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SANTA FE STUDIOS PHASE 1B & 2 |
|---|---|
| Permittee | Klinger Constructors, LLC |
| NPDES ID | NMR1004FX |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 25, 2022 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Santa Fe, NM 87508 |
| Subwatershed | Cienega River (HUC 130202010105) |
NPDES NMR1004FX: effluent limits and exceedances
SANTA FE STUDIOS PHASE 1B & 2 (NPDES NMR1004FX): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1004FX: no pollutant row on file.
NPDES NMR1004FX: inspections, violations and enforcement
NPDES NMR1004FX (SANTA FE STUDIOS PHASE 1B & 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1004FX
NPDES NMR1004FX: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1004FX
NPDES NMR1004FX: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.