NPDES NMR1004HY · Clean Water Act
METRO VERDE ARCADIA SUBDIVISION PHASE 1, Las Cruces, NM: NPDES NMR1004HY discharge permit, effluent exceedances, inspections, penalties
METRO VERDE ARCADIA SUBDIVISION PHASE 1, Las Cruces, New Mexico: General permit coverage NMR1004HY, held by Caliper Construction, Inc.; Construction stormwater; Administratively continued; issued February 14, 2022, term to February 15, 2022, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 577 were issued before NMR1004HY. Caliper Construction, Inc. holds 10 permits in New Mexico.
Other permits held by Caliper Construction, Inc.
- RED HAWK ESTATES, PHASE 2, Las Cruces: NMR1004AH, issued 2021-11-01
- ORO GRANDE REPEATER SITE REMOVAL AND RECLAMATION, Orogrande: NMR10052L
- METRO VERDE NORTH PHASE 1 SUBDIVISION OCT 2024 START, Las Cruces: NMR1006TJ, issued 2024-11-13
- METRO SQUARE, PHASE 1 SUBDIVISION CONTRACTOR, Las Cruces: NMR100760, issued 2025-05-07
- METRO VERDE NORTH, PHASE 3 SUBDIVISION CONTRACTOR, Las Cruces: NMR100761, issued 2025-05-08
- METRO HORIZON PHASE 2C SUBDIVISION GC, Las Cruces: NMR1007B1, issued 2025-07-17
- RED HAWK ESTATES, PHASE 3A SUBDIVISION - CONTRACTOR, Las Cruces: NMR1007B6, issued 2025-07-21
- METRO EVOLUTION, PHASE 1 SUBDIVISION CONTRACTOR, Las Cruces: NMR1007BC, issued 2025-07-22
- METRO VERDE ARCADIA, PHASE 4 SUBDIVISION CONTRACTOR, Las Cruces: NMR1007CX, issued 2025-08-07
Coverages issued nearest NMR1004HY
- 2022-02-14: AGUA FRIA WASTEWATER IMPROVEMENTS, Santa Fe: NMR1004HS, held by TLC Plumbing and Utility
- 2022-02-14: 2021-2022 PAVEMENT REPLACEMENT - PHASE 1, Las Cruces: NMR1004HT, held by City of Las Cruces
- 2022-02-14: VOLCANO MESA, Albuquerque: NMR1004HU, held by Salls Brothers Construction
- 2022-02-14: EAST MESA PUBLIC RECREATION COMPLEX PH I, Las Cruces: NMR1004HV, held by City of Las Cruces
- 2022-02-14: RECONSTRUCT TAXIWAY MIKE & DELTA, Cannon Afb: NMR1004HW, held by Ahtna Design-Build, Inc.
- 2022-02-14: RECC REPAIR PAD 3, PAD 3 TAXIWAY, TAXIWAY H & APRON B, Albuquerque: NMR1004HZ, held by Bristol General Contractors, LLC
- 2022-02-14: 6084-508 LOS LUNAS, NM WAL-MART DISTRIBUTION CENTER, Los Lunas: NMR1004I5, held by Wal-Mart Stores East, LP
- 2022-02-14: 28 SIERRA ROSA LOOP, Santa Fe: NMR1004I7, held by Richard Lucero
- 2022-02-14: 6351 WAGONS EAST TRAIL SFH, Las Cruces: NMR1004I8, held by Felipe Luna
- 2022-02-14: SINGLE-FAMILY HOME AT 260 VISTA DEL REY DR, Vado: NMR1004IA, held by James W. Nielsen
METRO VERDE ARCADIA SUBDIVISION PHASE 1 among its neighbors
84 discharge permits are in the Indian Lake subwatershed (HUC 130301030507); NMR1004HY is one.
Other permits in the Indian Lake subwatershed (HUC 130301030507)
- 15515 SPACE MURALS - SINGLE FAMILY RESIDENCE, Las Cruces: NMR1003BN, minor, term to 2022-02-15
- 15575 SPACE MURALS LANE DRIVEWAY AND BUILDING, Las Cruces: NMR1006TB, minor, term to 2027-02-16
- 6327 WAGONS EAST TRAIL - ROADRUNNER CONSTRUCTION, Las Cruces: NMR1004UG, minor, term to 2027-02-16
- 6351 WAGONS EAST TRAIL SFH, Las Cruces: NMR1004I8, minor, term to 2022-02-15
- AMBER MESA ROADS, Las Cruces: NMR1007FO, minor, term to 2027-02-16
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002WX
- BERRY PATCH AVENUE ROADWAY AND DRAINAGE PROJECT, Las Cruces: NMR1002XA
- BRAHMAN DIVERSION CHANNEL EXTENSION (DRAGON FLY), Las Cruces: NMR10066F, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, CONTRACTOR, Las Cruces: NMR1005H5, minor, term to 2027-02-16
- DEVELOPMENT AT 9575 BATAAN MEMORIAL WEST, OWNER, Las Cruces: NMR1005H6, minor, term to 2027-02-16
What stands out
- Its term runs 1 day, February 14, 2022 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | METRO VERDE ARCADIA SUBDIVISION PHASE 1 |
|---|---|
| Permittee | Caliper Construction, Inc. |
| NPDES ID | NMR1004HY |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 14, 2022 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Las Cruces, NM 88012 |
| Subwatershed | Indian Lake (HUC 130301030507) |
NPDES NMR1004HY: effluent limits and exceedances
METRO VERDE ARCADIA SUBDIVISION PHASE 1 (NPDES NMR1004HY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1004HY: no pollutant row on file.
NPDES NMR1004HY: inspections, violations and enforcement
NPDES NMR1004HY (METRO VERDE ARCADIA SUBDIVISION PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1004HY
NPDES NMR1004HY: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1004HY
NPDES NMR1004HY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.