NPDES NMR1005KD · Clean Water Act
ALDEA NEW RESIDENCE, Santa Fe, NM: NPDES NMR1005KD discharge permit, effluent exceedances, inspections, penalties
ALDEA NEW RESIDENCE, Santa Fe, New Mexico: General permit coverage NMR1005KD, held by El Bosque Builders LLC; Construction stormwater; Effective; issued April 30, 2023, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 1,235 were issued before NMR1005KD. El Bosque Builders LLC holds 3 permits in New Mexico.
Other permits held by El Bosque Builders LLC
- DOAK RESIDENCE, Santa Fe: NMR100612, issued 2023-11-27
- VIA PAMPA RESIDENCE, Santa Fe: NMR1006TX, issued 2024-11-20
Coverages issued nearest NMR1005KD
- 2023-04-26: VERGES RESIDENCE, Santa Fe: NMR1005JX, held by Sol Terra Design + Build
- 2023-04-28: 7067 CALLE ESTANCIA _ SINGLE FAMILY RESIDENCE, Las Cruces: NMR1005K7, held by Robert Pophal _ West Mesa Builders
- 2023-04-28: 3521 NORTHRISE DR, Las Cruces: NMR1005K8, held by Renegade Construction LLC
- 2023-04-28: GRIEGOS FARMS, Albuquerque: NMR1005K9, held by Guzman Construction Solutions
- 2023-04-28: CONSTRUCTION OF GIRASOL SOUTH ROAD, MESQUITE, NM, Mesquite: NMR1005KA, held by Armando Lozoya, Jr.
- 2023-05-01: WHITEHORSE LAKE MAINTENANCE FACILITY, Whitehorse Lake: AZR10I0Z7, held by Navajo Nation Department of Transportation
- 2023-05-01: SINGLE FAMILY HOME - SPUR RIDGE RD LOT 3, R0318899, Las Cruces: NMR1005KE, held by Villa Custom Homes
- 2023-05-01: CAMPOS PROJECT, Las Cruces: NMR1005KF, held by Erasmo Campos
- 2023-05-01: BUBBAS LAS CRUCES, Las Cruces: NMR1005KG, held by G. Sandoval Construction, Inc.
- 2023-05-01: BANDELIER NATIONAL MONUMENT TSANKAWI AND FREY PARKING LOTS, Los Alamos: NMR1005KI, held by Federal Highway Administration, Central Federal Lands Highway Division
ALDEA NEW RESIDENCE among its neighbors
39 discharge permits are in the Arroyo Calabasas subwatershed (HUC 130202010101); NMR1005KD is one.
Other permits in the Arroyo Calabasas subwatershed (HUC 130202010101)
- 124 SUNFLOWER DRIVE, Santa Fe: NMR1006SO, minor, term to 2027-02-16
- 19 CAMINO BARRANCA RESIDENCE, Santa Fe: NMR1006PH, minor, term to 2027-02-16
- 19 KOSHARI RESIDENCE, Santa Fe: NMR1001ZA
- 24 GRAYTHORN DRIVE, Santa Fe: NMR10079M, minor, term to 2027-02-16
- 26 SIERRA ROSA LOOP, Santa Fe: NMR100639, minor, term to 2027-02-16
- 26 SIERRA ROSA LOOP, Santa Fe: NMR1007I1, minor, term to 2027-02-16
- 27 CAMINO ESPERANZA RESIDENCE, Santa Fe: NMR1006K1, minor, term to 2027-02-16
- 28 SIERRA ROSA LOOP, Santa Fe: NMR1004I7, minor, term to 2022-02-15
- 37 ARROYO PRIVADO, Santa Fe: NMR1005LK, minor, term to 2027-02-16
- 39 CALLE VENTOSO EAST, Santa Fe: NMR1007DQ, minor, term to 2027-02-16
What stands out
- Its term runs 3 years and 292 days, April 30, 2023 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALDEA NEW RESIDENCE |
|---|---|
| Permittee | El Bosque Builders LLC |
| NPDES ID | NMR1005KD |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 30, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Santa Fe, NM 87507 |
| Subwatershed | Arroyo Calabasas (HUC 130202010101) |
NPDES NMR1005KD: effluent limits and exceedances
ALDEA NEW RESIDENCE (NPDES NMR1005KD): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1005KD: no pollutant row on file.
NPDES NMR1005KD: inspections, violations and enforcement
NPDES NMR1005KD (ALDEA NEW RESIDENCE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1005KD
NPDES NMR1005KD: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1005KD
NPDES NMR1005KD: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.