NPDES NMR1006P1 · Clean Water Act
CAMPUS PARK, PHASE II, Rio Rancho, NM: NPDES NMR1006P1 discharge permit, effluent exceedances, inspections, penalties
CAMPUS PARK, PHASE II, Rio Rancho, New Mexico: General permit coverage NMR1006P1, held by City of Rio Rancho; Construction stormwater; Not needed.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file. City of Rio Rancho holds 18 permits in New Mexico.
Other permits held by City of Rio Rancho
- ABRAZO ROAD ASPHALT RESURFACING, Rio Rancho: NMR1005GA
- LAZO ROAD CONSTRUCTION PROJECT, Rio Rancho: NMR10068L
- IDALIA ROAD CULVERT CROSSING, Rio Rancho: NMR1006VE, issued 2024-12-05
- DISTRICT 4 RESIDENTIAL MILL AND INLAY HYBRID, PHASE 3, Rio Rancho: NMR1006Y6
- BROADMOOR BLVD MILL AND INLAY PROJECT, Rio Rancho: NMR1006Y7, issued 2025-01-24
- DISTRIC 4 RESIDENTIAL HYBRID MILL AND INLAY, PHASE 3 - UNIT 2, Rio Rancho: NMR1007CU, issued 2025-08-06
- LEMA ROAD RECONSTRUCTION PROJECT, Rio Rancho: NMR1007GF, issued 2025-09-25
- 19TH AVE RECONSTRUCTION PROJECT, Rio Rancho: NMR1007GH
- DISTRICT 1 RESIDENTIAL HYBRID, PHASE 3. UNIT 1 - BRAZOS DR SE, Rio Rancho: NMR1007KM
- WWTP - PLANT 2 HEADWORKS, Rio Rancho: NMR1007KN, issued 2025-12-01
CAMPUS PARK, PHASE II among its neighbors
56 discharge permits are in the Arroyo de Las Baranca-Rio Grande subwatershed (HUC 130202030103); NMR1006P1 is one.
Other permits in the Arroyo de Las Baranca-Rio Grande subwatershed (HUC 130202030103)
- 1521 GROS VENTRE RIO RANCHO NM 87144, Rio Rancho: NMR1007Y4, minor, term to 2027-02-16
- 2020 CLIFF DRIVE NE, MLX CONVERSION, Rio Rancho: NMR10002F
- 2025 EUCALYPTUS RESIDENTIAL DEVELOPMENT, Rio Rancho: NMR1004YB
- 2029 EUCALYPTUS, RESIDENTIAL DEVELOPMENT, Rio Rancho: NMR1004YC
- 2033 EUCALYPTUS RESIDENTIAL DEVELOPMENT, Rio Rancho: NMR1004YD
- 3508 NORTHERN BLVD RV STORAGE PARK, Rio Rancho: NMR1006RG
- 933 CAMINO VISTA RIO, Bernalillo: NMR1007WP, minor, term to 2027-02-16
- BROADMOOR HEIGHTS, Rio Rancho: NMR1001UB, minor, term to 2022-02-15
- BROADMOOR HEIGHTS UNIT 4, Rio Rancho: NMR1006ZM, minor, term to 2027-02-16
- BROADMOOR HEIGHTS UNIT 4, Rio Rancho: NMR1007P3, minor, term to 2027-02-16
What stands out
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater.
Identity
| Facility | CAMPUS PARK, PHASE II |
|---|---|
| Permittee | City of Rio Rancho |
| NPDES ID | NMR1006P1 |
| Status | Not needed |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Address | Rio Rancho, NM 87144 |
| Subwatershed | Arroyo de Las Baranca-Rio Grande (HUC 130202030103) |
NPDES NMR1006P1: effluent limits and exceedances
CAMPUS PARK, PHASE II (NPDES NMR1006P1): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1006P1: no pollutant row on file.
NPDES NMR1006P1: inspections, violations and enforcement
NPDES NMR1006P1 (CAMPUS PARK, PHASE II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1006P1
NPDES NMR1006P1: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1006P1
NPDES NMR1006P1: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.