NPDES NMR1006YU · Clean Water Act
KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY, Socorro, NM: NPDES NMR1006YU discharge permit, effluent exceedances, inspections, penalties
KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY, Socorro, New Mexico: General permit coverage NMR1006YU, held by FRANKEN CONSTRUCTION; Construction stormwater; Effective; issued January 31, 2025, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 2,298 were issued before NMR1006YU. FRANKEN CONSTRUCTION holds 9 permits in New Mexico.
Other permits held by FRANKEN CONSTRUCTION
- MONTE VISTA ES CLASSROOM ADDITION AND ADMINISTRATION RENOVATION, Albuquerque: NMR1005HC, issued 2023-03-30
- IAIA MIXED USE BUILDING, Santa Fe: NMR1005XA, issued 2023-10-16
- APS COCHITI ES CLASSROOM ADDITION, Albuquerque: NMR10063M, issued 2023-12-27
- LOS RANCHOS AGRI-NATURE CENTER PH. 2, Los Ranchos De Albuquerque: NMR1006BW
- CNM AND NMMED FILM CENTER AT THE RAILYARDS, Albuquerque: NMR1006CZ, issued 2024-04-25
- HI - FLYING HANGARS - BUILDING B, Albuquerque: NMR10075L, issued 2025-05-01
- RIO ARRIBA COUNTY SKILLED NURSING FACILITY, Espanola: NMR100765, issued 2025-05-09
- CNM RIO RANCHO APPLIED TECHNOLOGY, Rio Rancho: NMR10079X, issued 2025-07-02
Coverages issued nearest NMR1006YU
- 2025-01-29: CN6101291 MCKINLEY CTY NM118, Rehoboth: AZR10I1AG, held by FNF Construction, Inc
- 2025-01-29: BRIDGE 8111 REPLACEMENT, Flora Vista: NMR1006YO, held by Hasse Contracting
- 2025-01-30: BUILDING & INFRASTRUCTURE ON COLTON ROAD (NO ADDRESS), 17.17 ACRE, R1909808, Santa Teresa: NMR1006YR, held by Ceran Builders LLC
- 2025-01-30: ELEPHANT BUTTE HISTORIC DISTRICT - UTILITIES REHAB, Truth Or Consequences: NMR1006YS, held by Bureau of Reclamation
- 2025-01-31: PUBLIC SERVICE CO. OF NM EVAPORATION POND INSTALLATION, Lordsburg: NMR1006YT, held by MANSCo
- 2025-01-31: B8D, Bloomfield: NMR1006YV, held by B8D LLC
- 2025-01-31: TA-63-0220 PCOC-1 PROJECT, Los Alamos: NMR1006YX, held by Hensel Phelps Construction Company
- 2025-02-03: LEA COUNTY ZIP FRANKLIN MEMORIAL AIRPORT (E06) RUNWAY 12-30 MIRL SYSTEM, Lovington: NMR1006YY, held by Bixby Electric, Inc.
- 2025-02-04: NA-22-LP2: ALAMO O&M WATER IMPROVEMENTS, Alamo: AZR10I1AL, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-02-04: PROJECT 1475: NGWSP BBN9 - REACH 10.1.1 BOP, Coyote Canyon: AZR10I1AN, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY among its neighbors
19 discharge permits are in the Arroyo de La Matanza-Rio Grande subwatershed (HUC 130202031006); NMR1006YU is one.
Other permits in the Arroyo de La Matanza-Rio Grande subwatershed (HUC 130202031006)
- A-1 QUALITY ASPHALT, Socorro: NMR05GE92
- A-1 QUALITY REDI-MIX, Socorro: NMR05GE93
- A-1 QUALITY REDI-MIX, Socorro: NMR05GJ85
- A-1 QUALITY REDI-MIX, INC., Socorro: NMU001574
- AMADOR COMPLETE RECYCLING-SOCORRO, Socorro: NMNOE3618, minor, term to 2023-02-05
- BULLOCK AVE. STREET IMPROVEMENTS, Socorro: NMR1003T4
- CUBA RD STREET AND DRAINAGE IMPROVEMENTS, Socorro: NMR10059I
- EAGLE PICHER GROUND WATER CONVEYANCE AND TREATMENT SYSTEM, Socorro: NMR10080B, minor, term to 2027-02-16
- EAGLE PICHER GROUND WATER CONVEYANCE AND TREATMENT SYSTEM, Socorro: NMR10080O, minor, term to 2027-02-16
- EAGLE PICHER TREATED GROUNDWATER DISCHARGE SYSTEM, Socorro: NMR1007SQ, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 16 days, January 31, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY |
|---|---|
| Permittee | FRANKEN CONSTRUCTION |
| NPDES ID | NMR1006YU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 31, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Socorro, NM 87801 |
| Subwatershed | Arroyo de La Matanza-Rio Grande (HUC 130202031006) |
NPDES NMR1006YU: effluent limits and exceedances
KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY (NPDES NMR1006YU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1006YU: no pollutant row on file.
NPDES NMR1006YU: inspections, violations and enforcement
NPDES NMR1006YU (KELLY HALL REPLACEMENT BUILDING NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1006YU
NPDES NMR1006YU: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1006YU
NPDES NMR1006YU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.