ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD, Lordsburg, NM: NPDES NMR1007NR discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD, held by Logisticus Projects Group, holds NPDES permit NMR1007NR. EPA’s file records it issued January 22, 2026 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD: its NPDES ID, its permit type and status, its dates, its address in Lordsburg, New Mexico. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES NMR1007NR.
What stands out
- Its term runs 1 year and 25 days, January 22, 2026 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD |
|---|---|
| Permittee as filed | Logisticus Projects Group |
| NPDES ID | NMR1007NR |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 22, 2026 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | Lordsburg, NM 88045 |
| Subwatershed | Walker Canyon (HUC 150400030307) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES NMR1007NR.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES NMR1007NR.
Inspections
EPA’s inspection file holds no inspection for NPDES NMR1007NR.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES NMR1007NR.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, NMR1007NR.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID NMR1007NR there.
ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD, Lordsburg, New Mexico: Coverage under a general permit NMR1007NR, held by Logisticus Projects Group; Construction stormwater; Effective; issued January 22, 2026, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 2,973 were issued before NMR1007NR.
Coverages issued nearest NMR1007NR
- 2026-01-19: CN6101151 MCKINLEY COUNTY, Rehoboth: NMR1007NM, held by Siete, Inc
- 2026-01-19: EAGLE RIDGE PHASE I, TASK 1, Santa Fe: NMR10I0AH, held by Young Guns Construction, LLC
- 2026-01-20: NEW MEXICO DEPARTMENT OF PUBLIC SAFETY REALITY BASED TRAINING FACILITY, Santa Fe: NMR1007NN, held by Jaynes Corporation
- 2026-01-21: FEEDER 3 TRANSMISSION LINE, Belen: NMR1007NP, held by Middle Rio Grande Conservancy District
- 2026-01-21: ZUNI SOLID WASTE FACILITY, Zuni: NMR10I0AI, held by ENTERPRISE BUILDERS CORPORATION
- 2026-01-22: CN E100321/322 DONA ANA COUNTY, Chaparral: NMR1007NS, held by NMDOT District One
- 2026-01-22: CN 6101151, Rehoboth: NMR1007NT, held by NMDOT
- 2026-01-22: LINCOLN WATER DISTRIBUTION LINE, Lincoln: NMR1007NW, held by Lincoln Mutual Domestic Water Consumers Association
- 2026-01-23: ROCKY MOUNTAIN YOUTH CORPS - WORKFORCE TRAINING FACILITY, Taos: NMR1007NY, held by R and M Construction, LLC
- 2026-01-23: TAKE 5 OIL CHANGE GIBSON ABQ DD, Albuquerque: NMR1007NZ, held by Durban Development
ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD among its neighbors
3 discharge permits are in the Walker Canyon subwatershed (HUC 150400030307); NMR1007NR is one.
Other permits in the Walker Canyon subwatershed (HUC 150400030307)
- GREAT DIVIDE WIND - GEOTECH, Lordbsurg: NMR1006NI, minor, term to 2027-02-16
- PYRAMID #2, Lordsburg: NMR1001WR
Nearby on the register
- Discharge permits in Lordsburg
- Every permit record in Lordsburg, A to Z
- Discharge permits in New Mexico
- Every permit record in New Mexico, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The ULMORRIS ROAD SOUTH / ARMIDA ROAD MARSHALLING YARD permit, held by Logisticus Projects Group in Lordsburg, New Mexico, is one of 3 NPDES permits within the Walker Canyon subwatershed, this one included. Among the 13 storm water construction permits in Lordsburg, this one included, 75.0% were issued earlier than this permit, and the permit has none of the 0 pollutants under a numeric limit or the 0 pollutants with an effluent exceedance recorded against it. Of those same 13 Lordsburg storm water construction permits, 0.0% have a violation on file, which places this permit in a group with no recorded violations.