NPDES NMR1007YE · Clean Water Act
FHWA HERON AND EL VADO ROAD REHABILITATION, Rutheron, NM: NPDES NMR1007YE discharge permit, effluent exceedances, inspections, penalties
FHWA HERON AND EL VADO ROAD REHABILITATION, Rutheron, New Mexico: General permit coverage NMR1007YE, held by Siete, Inc; Construction stormwater; Effective; issued May 28, 2026, term to February 16, 2027, by U.S. EPA.
New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 3,317 were issued before NMR1007YE. Siete, Inc holds 3 permits in New Mexico.
Other permits held by Siete, Inc
- CN6101151 MCKINLEY COUNTY, Rehoboth: NMR1007NM, issued 2026-01-19
- REHOBOTH CHRISTIAN SCHOOL BORROW AREA, Rehoboth: NMR1007OM, issued 2026-01-30
Coverages issued nearest NMR1007YE
- 2026-05-26: SANTA ANA WELL #5 ARSENIC TREATMENT SYSTEM, Santa Ana Pueblo: NMR10I0AQ, held by TLC Company, Inc
- 2026-05-27: EAST GREENE ST WATER SYSTEM IMPROVEMENTS, Carlsbad: NMR1007YA, held by Smithco Construction
- 2026-05-27: GREENE STREET STORM DRAIN IMPROVEMENTS, Carlsbad: NMR1007YB, held by Constructors Inc
- 2026-05-27: CORAZON ENERGY STORAGE, Albuquerque: NMR1007YC, held by Corazon Energy Storage, LLC
- 2026-05-28: TOME VISTA PHASES 4 & 5, Los Lunas: NMR1007YD, held by DR HORTON HOME BUILDERS
- 2026-05-28: VILLAGE OF ANGEL FIRE - FIRE STATION, Angel Fire: NMR1007YF, held by Franken Construction Co., Inc.
- 2026-05-29: G-80 POD #8 & #13 WELL CONTRACT #1, Gallup: NMR1007YG, held by Murphy Builders Inc.
- 2026-05-29: SUNZIA WIND SOUTH-ZONE 6, Corona: NMR1007YH, held by SunZia Wind South LLC
- 2026-05-29: CORAZON ENERGY STORAGE FACILITY, Albuquerque: NMR1007YI, held by Gridworks, Inc.
- 2026-05-29: CANADIAN RIVER WATER LINE CROSSING, Logan: NMR1007YJ, held by J&H Service, Inc.
FHWA HERON AND EL VADO ROAD REHABILITATION among its neighbors
1 discharge permits are in the Heron Reservoir subwatershed (HUC 130201020305); NMR1007YE is one.
What stands out
- Its term runs 264 days, May 28, 2026 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FHWA HERON AND EL VADO ROAD REHABILITATION |
|---|---|
| Permittee | Siete, Inc |
| NPDES ID | NMR1007YE |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 28, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Rutheron, NM 87551 |
| Subwatershed | Heron Reservoir (HUC 130201020305) |
NPDES NMR1007YE: effluent limits and exceedances
FHWA HERON AND EL VADO ROAD REHABILITATION (NPDES NMR1007YE): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NMR1007YE: no pollutant row on file.
NPDES NMR1007YE: inspections, violations and enforcement
NPDES NMR1007YE (FHWA HERON AND EL VADO ROAD REHABILITATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NMR1007YE
NPDES NMR1007YE: one email when its EPA record changes — $99/month.
Permits near NPDES NMR1007YE
NPDES NMR1007YE: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.