Velarion Records
Free: one email when NPDES NMR10083R changes. Unsubscribe any time.

NPDES NMR10083R · Clean Water Act

THE PUEBLOS AT ALAMEDA RANCH PHASE 4, Las Cruces, NM: NPDES NMR10083R discharge permit, effluent exceedances, inspections, penalties

THE PUEBLOS AT ALAMEDA RANCH PHASE 4, Las Cruces, New Mexico: General permit coverage NMR10083R, held by Smith & Aguirre Construction; Construction stormwater; Effective; issued August 25, 2026, term to February 16, 2027, by U.S. EPA.

New Mexico holds 4,767 Construction stormwater coverages of this permit type in EPA’s file; 3,517 were issued before NMR10083R. Smith & Aguirre Construction holds 4 permits in New Mexico.

Other permits held by Smith & Aguirre Construction

Coverages issued nearest NMR10083R

Other permits in Las Cruces

What stands out

  • Its term runs 175 days, August 25, 2026 to February 16, 2027.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 5,500 discharge permits on the register in New Mexico; 4,769 of them (87%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityTHE PUEBLOS AT ALAMEDA RANCH PHASE 4
PermitteeSmith & Aguirre Construction
NPDES IDNMR10083R
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedAugust 25, 2026
ExpiresFebruary 16, 2027
AgencyU.S. EPA
AddressLas Cruces, NM 88011

NPDES NMR10083R: effluent limits and exceedances

THE PUEBLOS AT ALAMEDA RANCH PHASE 4 (NPDES NMR10083R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES NMR10083R: no pollutant row on file.

NPDES NMR10083R: inspections, violations and enforcement

NPDES NMR10083R (THE PUEBLOS AT ALAMEDA RANCH PHASE 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES NMR10083R

NPDES NMR10083R: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES NMR10083R

NPDES NMR10083R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.