REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2, Bronx, NY: NPDES NYR11R322 discharge permit, effluent exceedances, inspections, penalties
REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2, Bronx, New York: General permit coverage NYR11R322, held by Yonkers Contracting Co; Construction stormwater; Effective; issued January 29, 2025, term to January 28, 2030, by NYSDEC; discharges to Bronx River, Middle, and tribs.
New York holds 5,628 Construction stormwater coverages of this permit type in EPA’s file; 34 were issued before NYR11R322.
Coverages issued nearest NYR11R322
- 2025-01-29: TOTTENVILLE SHORELINE PROTECTION, New York: NYR11R317, held by New York City Department of Parks and Recreation
- 2025-01-29: THE PRESERVE AT SOUTH COUNTRY ROAD, Quiogue: NYR11R318, held by South Country Roads Apartment LLC
- 2025-01-29: ALLEN AND GENESEE NATURAL GAS DISTRIBUTION PROJECT, East Concord: NYR11R319, held by National Fuel Gas Distribution Corporation
- 2025-01-29: MAVIS TIRE SUPPLY - LOWE'S DRIVE, Wilton: NYR11R320, held by Mavis Tire Supply
- 2025-01-29: KAZAM - ANDES HOUSE PROJECT, Andes: NYR11R321, held by Ezra Kazam
- 2025-01-29: TWIN BIRCH DAIRY - SITE EXPANSION, Skaneateles: NYR11R323, held by Twin Birch Dairy, LLC
- 2025-01-29: LN-24 GROUND BED, Hume: NYR11R324, held by Eastern Gas Transmission and Storage, Inc
- 2025-01-29: LN-546 ILI DIGS 1, 6, AND 7, Orangeville: NYR11R325, held by Eastern Gas Transmission and Storage,Inc
- 2025-01-29: KADOSH RESIDENCE, Chappaqua: NYR11R326, held by Michael Kadosh
- 2025-01-29: 17 RAVENNA DRIVE, Pomona: NYR11R327, held by 17 Ravenna Drive LLC
REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2 among its neighbors
26 discharge permits are in the Lower Bronx River subwatershed (HUC 020301020103); NYR11R322 is one.
Other permits in the Lower Bronx River subwatershed (HUC 020301020103)
- ARTCRAFT SILVERSMITHS INC., Mount Vernon: NYP081070
- BRONX RIVER CSO LONG TERM CONTROL PLAN (CSO-BXR-DES) HP-009 PROJECT AREA, New York City: NYR11M776, minor, term to 2030-01-28
- BRONX RIVER PARKWAY 2 BRIDGES REPLACEMENT PHASE 1, Bronx: NYR11N580, minor, term to 2030-01-28
- BRONX RIVER RESERVATION PATHWAY RENOVATION, Yonkers: NYR11C060, minor, term to 2030-01-28
- BURNT HILLS-BALLSTON LAKE CSD MIDDLE SCHOOL, Burnt Hills: NYR11P494, minor, term to 2030-01-28
- CAPITAL PROJECT WP-269 - PS-BX PUMPING STATIONS - 233RD ST. PUMPING STATION, Bronx: NYR11Q961, minor, term to 2030-01-28
- CROSS COUNTY CENTER, Yonkers: NYR10L206, minor, term to 2030-01-28
- CROTON ABOVE GROUND STRUCTURE AND LANDSCAPING, Bronx: NYR11E294, minor, term to 2030-01-28
- DUNWOODIE CENTRAL SUBSTATION, Yonkers, City Of: NY0250929, minor, term to 2029-06-30
- EMPIRE CITY CASINO AT YONKERS RACEWAY, Yonkers: NYA00E172, minor, term to 2022-06-30
What stands out
- Its term runs 4 years and 364 days, January 29, 2025 to January 28, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 11,145 discharge permits on the register in New York; 5,643 of them (51%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2 |
|---|---|
| Permittee | Yonkers Contracting Co |
| NPDES ID | NYR11R322 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 29, 2025 |
| Expires | January 28, 2030 |
| Agency | NYSDEC |
| Address | Bronx, NY 10462 |
| Receiving water | Bronx River, Middle, and tribs |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Bronx River (HUC 020301020103) |
NPDES NYR11R322: effluent limits and exceedances
REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2 (NPDES NYR11R322): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES NYR11R322: no pollutant row on file.
NPDES NYR11R322: inspections, violations and enforcement
NPDES NYR11R322 (REPLACEMENT OF TWO BRIDGE ON THE BRONX RIVER PARKWAY - PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES NYR11R322
NPDES NYR11R322: one email when its EPA record changes — $99/month.
Permits near NPDES NYR11R322
NPDES NYR11R322: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.