NPDES ORR10H683 · Clean Water Act
SILVONEN FARM, Toledo, OR: NPDES ORR10H683 discharge permit, effluent exceedances, inspections, penalties
SILVONEN FARM, Toledo, Oregon: General permit coverage ORR10H683, held by Abe Silvonen; Construction stormwater; Administratively continued; issued April 26, 2023, term to December 14, 2025.
Oregon holds 613 Construction stormwater coverages of this permit type in EPA’s file; 311 were issued before ORR10H683.
Coverages issued nearest ORR10H683
- 2023-03-21: GRAND RONDE HEALTHCARE AND VACCINATION CLINIC, Grand Ronde: ORR10I00H, held by Confederated Tribes of Grand Ronde Department of Public Works
- 2023-03-21: CITY OF EUGENE, Eugene: ORRCA0001, held by City of Eugene
- 2023-03-28: CITY OF PORTLAND - BUREAU OF ENVIRONMENTAL SERVICES 1200-CA CITYWIDE PROGRAMMATI, Portland: ORRCA0002, held by City of Portland Bureau of Environmental Services
- 2023-03-31: RUSTED GATE FARM PRODUCTION CO-OP AND FARM STORE, Central Point: ORR10H660, held by Adroit Construction Company Inc.
- 2023-04-12: EUGENE WATER & ELECTRIC BOARD, Eugene: ORRCA0003, held by Eugene Water & Electric Board
- 2023-05-29: KILKICH TRAFFIC SAFETY PROJECT, Coos Bay: ORR10I00I, held by Coquille Indian Tribe
- 2023-06-06: CHIPOTLE DRIVE-THRU, Wood Village: ORR10H752, held by Wood Village SE I, LLC
- 2023-06-09: APPLEGATE HILLS SUBDIVISION, Grants Pass: ORR10H764, held by Valerian Homes
- 2023-06-14: PORTLAND WATER BUREAU, Portland: ORRCA0004, held by Portland Water Bureau
- 2023-06-28: E. ALDRICH POINT, Clifton: ORR10H789, held by Columbia River Estuary Study Taskforce
SILVONEN FARM among its neighbors
1 discharge permits are in the Simpson Creek-Yaquina River subwatershed (HUC 171002040104); ORR10H683 is one. Its county: 21, 3 major; ORR10H683 is minor permit.
What stands out
- Its term runs 2 years and 232 days, April 26, 2023 to December 14, 2025; the term ended 275 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,616 discharge permits on the register in Oregon; 613 of them (38%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SILVONEN FARM |
|---|---|
| Permittee | Abe Silvonen |
| NPDES ID | ORR10H683 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 26, 2023 |
| Expires | December 14, 2025 |
| Address | Toledo, OR 97391 |
| Subwatershed | Simpson Creek-Yaquina River (HUC 171002040104) |
NPDES ORR10H683: effluent limits and exceedances
SILVONEN FARM (NPDES ORR10H683): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ORR10H683: no pollutant row on file.
NPDES ORR10H683: inspections, violations and enforcement
NPDES ORR10H683 (SILVONEN FARM): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ORR10H683
NPDES ORR10H683: one email when its EPA record changes — $99/month.
Permits near NPDES ORR10H683
NPDES ORR10H683: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.