NPDES ORR10J992 · Clean Water Act
PIPER RIDGE TOWNHOMES - LENNAR, Gresham, OR: NPDES ORR10J992 discharge permit, effluent exceedances, inspections, penalties
PIPER RIDGE TOWNHOMES - LENNAR, Gresham, Oregon: General permit coverage ORR10J992, held by Lennar Northwest LLC; Construction stormwater; Effective; issued June 12, 2026, term to December 14, 2026.
Oregon holds 613 Construction stormwater coverages of this permit type in EPA’s file; 499 were issued before ORR10J992. Lennar Northwest LLC holds 4 permits in Oregon.
Other permits held by Lennar Northwest LLC
- MILL CREEK MEADOWS, Woodburn: ORR10J850, issued 2026-01-26
- ELLINGSON FARM SUBDIVISION - VERTICAL, Albany: ORR10J915, issued 2026-04-27
- BONNIE MEADOWS LENNAR, Estacada: ORR10K085, issued 2026-08-19
Coverages issued nearest ORR10J992
- 2026-06-08: SOUTHERN OREGON HUMANE SOCIETY, Medford: ORR10J987, held by Southern Oregon Humane Society
- 2026-06-09: WALLOWA SUNRISE, Enterprise: ORR10J988, held by R6 Contracting Inc.
- 2026-06-10: CEDAR HILLS CROSSING PHASE 5, Beaverton: ORR10J989, held by Center Developments Oreg 3 LLC
- 2026-06-10: ALLENWOOD VILLAGE SUBDIVISION, Grants Pass: ORR10J990, held by Ink Built Architecture
- 2026-06-10: GOODALL, Lake Oswego: ORR10J991, held by Elite Development PNW, LLC
- 2026-06-12: PIONEER SWITCHYARD, Lexington: ORR10J993, held by Umatilla Electric Cooperative
- 2026-06-12: HESS CREEK PRESERVE PHASE 2, Newberg: ORR10J994, held by Hess Creek Preserve
- 2026-06-12: PAVEMENT RECONSTRUCTION - WALMART #02315, Dallas: ORR10J995, held by WAL-MART REAL ESTATE BUSINESS TRUST
- 2026-06-15: MCCC WOODCRAFTERS, Salem: ORR10J996, held by GENDEV LLC
- 2026-06-17: WHALE WATCH VILLAGE, Depoe Bay: ORR10J997, held by Hills of Depoe Bay, LLC
PIPER RIDGE TOWNHOMES - LENNAR among its neighbors
6 discharge permits are in the Upper Johnson Creek subwatershed (HUC 170900120101); ORR10J992 is one.
Other permits in the Upper Johnson Creek subwatershed (HUC 170900120101)
- CASCADE PRECISION INC., Boring: ORRZ00181, minor, term to 2026-06-30
- MR. TREE, INC, Happy Valley: ORRZ00083, minor, term to 2026-06-30
- PIPER RIDGE PHASE 2 & TRACT I, Gresham: ORR10K061, minor, term to 2030-12-14
- R.S. DAVIS RECYCLING, Gresham: ORR607213, minor, term to 2026-07-01
- SUNSET VILLAGE, Gresham: ORR10G200, minor, term to 2025-12-14
What stands out
- Its term runs 185 days, June 12, 2026 to December 14, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,616 discharge permits on the register in Oregon; 613 of them (38%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PIPER RIDGE TOWNHOMES - LENNAR |
|---|---|
| Permittee | Lennar Northwest LLC |
| NPDES ID | ORR10J992 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 12, 2026 |
| Expires | December 14, 2026 |
| Address | Gresham, OR 97080 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Upper Johnson Creek (HUC 170900120101) |
NPDES ORR10J992: effluent limits and exceedances
PIPER RIDGE TOWNHOMES - LENNAR (NPDES ORR10J992): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ORR10J992: no pollutant row on file.
NPDES ORR10J992: inspections, violations and enforcement
NPDES ORR10J992 (PIPER RIDGE TOWNHOMES - LENNAR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ORR10J992
NPDES ORR10J992: one email when its EPA record changes — $99/month.
Permits near NPDES ORR10J992
NPDES ORR10J992: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.