NPDES ORR10K007 · Clean Water Act
WHEATRIDGE SOLAR - OPTIMIZATION I, Lexington, OR: NPDES ORR10K007 discharge permit, effluent exceedances, inspections, penalties
WHEATRIDGE SOLAR - OPTIMIZATION I, Lexington, Oregon: General permit coverage ORR10K007, held by Blattner Energy, LLC; Construction stormwater; Effective; issued June 25, 2026, term to December 14, 2030.
Oregon holds 613 Construction stormwater coverages of this permit type in EPA’s file; 513 were issued before ORR10K007. Blattner Energy, LLC holds 2 permits in Oregon.
Other permits held by Blattner Energy, LLC
- WHEATRIDGE SOLAR - OPTIMIZATION II, Lexington: ORR10J959, issued 2026-05-22
Coverages issued nearest ORR10K007
- 2026-06-22: SHEPHERDS WALK, Creswell: ORR10K002, held by NATHAN MARPLE
- 2026-06-23: COLFAX SOLAR, Eagle Point: ORR10K003, held by Evergreen Renewables
- 2026-06-23: WILLAMETTE NATIONAL CEMETERY, Portland: ORR10K004, held by National Cemetery Administration
- 2026-06-24: MAVERICK SUBSTATION, Lexington: ORR10K005, held by PacifiCorp
- 2026-06-24: OBSIDIAN SOLAR SKID PILE DRIVING PROJECT, Silver Lake: ORR10K006, held by SOLV Energy, LLC
- 2026-06-25: IMPERIAL WIND, Maupin: ORR10K008, held by Avangrid Power, LLC
- 2026-06-25: HIDDEN HILL PHASE 3, Medford: ORR10K009, held by CLE Residential LLC
- 2026-06-25: COOPER CREEK BOAT RAMP PARKING LOT, Sutherlin: ORR10K010, held by JRT Construction LLC
- 2026-06-29: SINGH RESIDENCE, Salem: ORR10K011, held by GCB Arch
- 2026-06-29: BEAR CREEK FISH HABITAT RESTORATION, Wallowa: ORR10K012, held by Northwest Watershed Restoration LLC
WHEATRIDGE SOLAR - OPTIMIZATION I among its neighbors
1 discharge permits are in the Upper Juniper Canyon subwatershed (HUC 170701010701); ORR10K007 is one.
What stands out
- Its term runs 4 years and 172 days, June 25, 2026 to December 14, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,616 discharge permits on the register in Oregon; 613 of them (38%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WHEATRIDGE SOLAR - OPTIMIZATION I |
|---|---|
| Permittee | Blattner Energy, LLC |
| NPDES ID | ORR10K007 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 25, 2026 |
| Expires | December 14, 2030 |
| Address | Lexington, OR 97839 |
| Subwatershed | Upper Juniper Canyon (HUC 170701010701) |
NPDES ORR10K007: effluent limits and exceedances
WHEATRIDGE SOLAR - OPTIMIZATION I (NPDES ORR10K007): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES ORR10K007: no pollutant row on file.
NPDES ORR10K007: inspections, violations and enforcement
NPDES ORR10K007 (WHEATRIDGE SOLAR - OPTIMIZATION I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES ORR10K007
NPDES ORR10K007: one email when its EPA record changes — $99/month.
Permits near NPDES ORR10K007
NPDES ORR10K007: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.