Velarion Records
Free: one email when NPDES WA0026832 changes. Unsubscribe any time.

NPDES WA0026832 · Clean Water Act

JOHN DAY PROJECT - USACE, Rufus, OR: NPDES WA0026832 discharge permit, effluent exceedances, inspections, penalties

JOHN DAY PROJECT - USACE, Rufus, Oregon: Individual permit WA0026832; Effective; issued March 24, 2023, term to June 30, 2028; discharges to COLUMBIA RIVER; Hydroelectric Power Generation.

3 of the 6 pollutants listed for NPDES WA0026832 have no violation or effluent exceedance.

  • Oil & Grease: 24 limits, 5 violations of any kind, 5 effluent exceedances, latest December 31, 2025, largest 440% over the limit.
  • Thermal Discharge: 1 limit, 3 violations of any kind.
  • Temperature, water deg. centigrade: 42 limits, 1 violation of any kind.
  • pH: 48 limits.
  • Flow, in conduit or thru treatment plant: 12 limits.
  • Oil and grease visual: 1 limit.
  • February 3, 2026: Evaluation (E).

JOHN DAY PROJECT - USACE among its neighbors

3 discharge permits are in the Hells Gate Canyon-Columbia River subwatershed (HUC 170701050103); WA0026832 is one. Its county: 4, 0 major; WA0026832 is minor permit.

Other permits in the Hells Gate Canyon-Columbia River subwatershed (HUC 170701050103)

What stands out

  • Its term runs 5 years and 98 days, March 24, 2023 to June 30, 2028.
  • Its newest dated event on file is an inspection on February 3, 2026, 253 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 1 inspection.
  • EPA's file dates 1 event for it, all in 2026.
  • 1 of its 6 pollutants on file has an effluent exceedance (17%); 6 are under a numeric limit; the largest exceedance is Oil & Grease at 440% over its limit.
  • It is one of 1,616 discharge permits on the register in Oregon; the file names no program for it, and it is a minor discharger.

Identity

FacilityJOHN DAY PROJECT - USACE
PermitteeJOHN DAY PROJECT - USACE
NPDES IDWA0026832
StatusEffective
TypeIndividual permit
ClassMinor
Facility typeFederal facility
IssuedMarch 24, 2023
ExpiresJune 30, 2028
AddressRufus, OR 97050
Receiving waterCOLUMBIA RIVER
Receiving water impaired303(D) Listed
SubwatershedHells Gate Canyon-Columbia River (HUC 170701050103)
NAICS221111 – Hydroelectric Power Generation
SIC4911 – Electric Services

NPDES WA0026832: effluent limits and exceedances

JOHN DAY PROJECT - USACE (NPDES WA0026832): 6 pollutants on file, 6 limited; 3 with a violation of any kind, 1 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Oil & Grease2455December 31, 2025440% over the limit
Thermal Discharge130
Temperature, water deg. centigrade4210
pH4800
Flow, in conduit or thru treatment plant1200
Oil and grease visual100

NPDES WA0026832: inspections, violations and enforcement

NPDES WA0026832: 1 inspection

DateWhat EPA recordedAgency
February 3, 2026EvaluationE

NPDES WA0026832 (JOHN DAY PROJECT - USACE): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES WA0026832

NPDES WA0026832: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES WA0026832

NPDES WA0026832: 6 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.