Velarion Records
Free: one email when NPDES PAC020684 changes. Unsubscribe any time.

NPDES PAC020684 · Clean Water Act

MIRAMAR LANDINGS, Ohara, Township Of, PA: NPDES PAC020684 discharge permit, effluent exceedances, inspections, penalties

MIRAMAR LANDINGS, Ohara, Township Of, Pennsylvania: General permit coverage PAC020684, held by River Road Development Group, LLC; Construction stormwater; Administratively continued; issued September 9, 2021, term to December 7, 2024, by Allegheny County Conservation District.

  • August 2, 2023: Failure to properly operate or maintain construction stormwater controls (ST6).
  • August 2, 2023: Discharge from a construction stormwater outfall to waters of the U.S. without NPDES permit coverage (ST6).
  • August 2, 2023: Failure to comply with monitoring requirements related to construction stormwater [40 CFR 122.41(j)] (ST6).
  • July 18, 2023: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
  • July 18, 2023: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • July 18, 2023: Failure to properly operate or maintain construction stormwater controls (ST6).
  • July 18, 2023: Failure to provide immediate notice - construction stormwater [40 CFR 122.41(l)(6)] (ST6).
  • July 18, 2023: Discharge from a construction stormwater outfall to waters of the U.S. without NPDES permit coverage (ST6).
  • July 18, 2023: Failure to comply with construction stormwater requirement - numeric or narrative effluent violation (ST6).
  • July 18, 2023: Failure to comply with monitoring requirements related to construction stormwater [40 CFR 122.41(j)] (ST6).

Pennsylvania holds 4,048 Construction stormwater coverages of this permit type in EPA’s file; 803 were issued before PAC020684.

Coverages issued nearest PAC020684

MIRAMAR LANDINGS among its neighbors

58 discharge permits are in the Allegheny River-Ohio River subwatershed (HUC 050100090308); PAC020684 is one. Its county: 695, 8 major; PAC020684 is minor permit.

Other permits in the Allegheny River-Ohio River subwatershed (HUC 050100090308)

What stands out

  • Its term runs 3 years and 89 days, September 9, 2021 to December 7, 2024; the term ended 647 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on August 2, 2023, 1,140 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 10 events for it, all in 2023.
  • It is one of 14,586 discharge permits on the register in Pennsylvania; 4,395 of them (30%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityMIRAMAR LANDINGS
PermitteeRiver Road Development Group, LLC
NPDES IDPAC020684
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 9, 2021
ExpiresDecember 7, 2024
AgencyAllegheny County Conservation District
AddressOhara, Township Of, PA 15238
SubwatershedAllegheny River-Ohio River (HUC 050100090308)

NPDES PAC020684: effluent limits and exceedances

MIRAMAR LANDINGS (NPDES PAC020684): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES PAC020684: no pollutant row on file.

NPDES PAC020684: inspections, violations and enforcement

NPDES PAC020684: 10 single-event violations

DateWhat EPA recordedAgency
August 2, 2023Failure to properly operate or maintain construction stormwater controlsST6
August 2, 2023Discharge from a construction stormwater outfall to waters of the U.S. without NPDES permit coverageST6
August 2, 2023Failure to comply with monitoring requirements related to construction stormwater [40 CFR 122.41(j)]ST6
July 18, 2023Failure to properly install, initiate, or fully implement construction stormwater controlsST6
July 18, 2023Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
July 18, 2023Failure to properly operate or maintain construction stormwater controlsST6
July 18, 2023Failure to provide immediate notice - construction stormwater [40 CFR 122.41(l)(6)]ST6
July 18, 2023Discharge from a construction stormwater outfall to waters of the U.S. without NPDES permit coverageST6
July 18, 2023Failure to comply with construction stormwater requirement - numeric or narrative effluent violationST6
July 18, 2023Failure to comply with monitoring requirements related to construction stormwater [40 CFR 122.41(j)]ST6

NPDES PAC020684 (MIRAMAR LANDINGS): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES PAC020684

NPDES PAC020684: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES PAC020684

NPDES PAC020684: 0 pollutant rows, 10 dated events; ICIS-NPDES download, loaded September 15, 2026.