NPDES 02R10I021 · Clean Water Act
ORIANA SOLAR II, Isabela, PR: NPDES 02R10I021 discharge permit, effluent exceedances, inspections, penalties
ORIANA SOLAR II, Isabela, Puerto Rico: General permit coverage 02R10I021, held by Oriana Energy, LLC; Construction stormwater; Effective; issued February 17, 2026, term to February 16, 2027, by U.S. EPA.
Puerto Rico holds 418 Construction stormwater coverages of this permit type in EPA’s file; 316 were issued before 02R10I021.
Coverages issued nearest 02R10I021
- 2026-01-19: HAMILTON SUNDSTRAND SOLAR POWER GENERATION SYSTEM RENEWABLE ENERGY PROJECT, Santa Isabel: 02R10I01Z, held by CARPE DIEM DEVELOPERS PR, LLC
- 2026-02-06: PHASE J EXPANSION PROJECT, Juana DíAz: 02R10I020, held by C.I.C. Construction Group S.E.
- 2026-02-09: CONSTRUCTION OF A SINGLE-FAMILY RESIDENCE, Rincon: 02R10I022, held by Mr. Hector Xavier Rodriguez
- 2026-02-10: SITE DEVELOPMENT FOR FUTURE COMMERCIAL BUILDINGS AT MONTE REAL PLAZA, Carolina: 02R10I023, held by PRIME BUILDERS & CONTRACTORS, INC.
- 2026-02-11: PONCE DE LEON #55, San Juan: 02R10I024, held by Pennrose Ponce de Leon Housing, LLC
- 2026-02-18: ENRIQUE ORTEGA WATER TREATMENT PLANT RAW WATER INTAKE POWER GENERATORS, Toa Alta: PRR1000LP, held by Alproem Engineering Contractors LLC
- 2026-03-09: SALIDA 35 SHOPPING MALL, Vega Baja: 02R10I025, held by Maglez Engineering & Contractors Corp
- 2026-03-10: AGUIRRE BESS CIVIL - STRUCTURAL WORKS, Salinas: PRR1000LO, held by RG Engineering, Inc.
- 2026-03-10: COSTA SUR BESS CIVIL-STRUCTURAL WORK, Guayanilla: PRR1000LR, held by RG Engineering, Inc.
- 2026-03-16: LADERAS DE PALMAS, Humacao: PRR1000LU, held by RBPR 2020, LLC
ORIANA SOLAR II among its neighbors
22 discharge permits are in the Non-contributing area-Name not assigned subwatershed (HUC 210100020507); 02R10I021 is one.
Other permits in the Non-contributing area-Name not assigned subwatershed (HUC 210100020507)
- 81ST RD PR901 ARMY RESERVE TRAINING CENTER PAVING, Aguadilla: 02R10I006, minor, term to 2027-02-16
- AGUADILLA AMSA 161-2 BMA RAMEY ARC, Aguadilla: PRNOEJ025, minor, term to 2028-02-14
- CEMEX ISABELA READY MIX SITE, Isabela: PRR05BM27
- COPAN INDUSTRIES INC., Aguadilla: PRR05J01J, minor, term to 2026-02-28
- HEWLETT PACKARD CARIBE BV LLC, Aguadilla: PRNOEJ01A, minor, term to 2026-05-28
- ISABELA TRUNK SEWER REPLACEMENT, Isabela: PRR1000L1, minor, term to 2027-02-16
- MIRAFLOR VILLAGE APARTMENTS, Isabela: PRR1000KW, minor, term to 2027-02-16
- MOCA MUNICIPAL LANDFILL, Moca: PRR05J016, minor, term to 2026-02-28
- PRASA ISABELA WTP, Isabela: PR0026638, major, term to 2023-07-31
- PRASA ROCHA WTP, Moca: PR0026760
Identity
| Facility | ORIANA SOLAR II |
|---|---|
| Permittee | Oriana Energy, LLC |
| NPDES ID | 02R10I021 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 17, 2026 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Isabela, PR 00662 |
| Subwatershed | Non-contributing area-Name not assigned (HUC 210100020507) |
NPDES 02R10I021: effluent limits and exceedances
ORIANA SOLAR II (NPDES 02R10I021): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES 02R10I021: no pollutant row on file.
NPDES 02R10I021: inspections, violations and enforcement
NPDES 02R10I021 (ORIANA SOLAR II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES 02R10I021
NPDES 02R10I021: one email when its EPA record changes — $99/month.
Permits near NPDES 02R10I021
NPDES 02R10I021: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.