NPDES PRR100014 · Clean Water Act
CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL, San Juan, PR: NPDES PRR100014 discharge permit, effluent exceedances, inspections, penalties
CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL, San Juan, Puerto Rico: General permit coverage PRR100014, held by Del Valle Group, SP; Construction stormwater; Administratively continued; issued May 29, 2017, term to February 15, 2022, by U.S. EPA.
Puerto Rico holds 418 Construction stormwater coverages of this permit type in EPA’s file; 1 were issued before PRR100014. Del Valle Group, SP holds 3 permits in Puerto Rico.
Other permits held by Del Valle Group, SP
- PAVEMENT REHABILITATION AND HIGHWAY SAFETY IMPROVEMENTS PR-2 KM. 185.8 TO 195.0, Sabana Grande: PRR1000FG, issued 2022-09-08
- REHABILITATION AND SCOUR MITIGATION OF BRIDGE # 1096 OVER GUANAJIBO RIVER, San German: PRR1000FJ, issued 2022-09-09
Coverages issued nearest PRR100014
- 2017-05-24: REPAIR/REPLACE PAVEMENT AIRCRAFT RAMP USCG AIRSTATION BORINQUEN, Aguadilla: PRR10000X, held by Delmonico Restoration & Development
- 2017-05-30: SABANERA DORADO, Dorado: PRR10001F, held by Hacienda San Martin, Inc.
- 2017-05-30: REPLACEMENT OF BRIDGE NO. 982 OVER PR-189 INT. PR-30 KM. 4.1, GURABO, Gurabo: PRR10001H, held by Constructora Santiago II Corp.
- 2017-06-20: REPLACEMENT OF BRIDGE NO. 178 OVER TOITA CREEK AT PR-14 KM 65.57, CAYEY, Cayey: PRR10002J, held by Tamrio, Inc.
- 2017-06-22: VILLAS DE LA CENTRAL VICTORIA, Juncos: PRR10002S, held by Martex Development, SE
- 2018-09-05: LAS CASONAS RESIDENTIAL DEVELOPMENT, Guaynabo: PRR100052, held by Las Casonas de la Vanda, LLC
CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL among its neighbors
32 discharge permits are in the Rio Puerto Nuevo at mouth subwatershed (HUC 210100050502); PRR100014 is one.
Other permits in the Rio Puerto Nuevo at mouth subwatershed (HUC 210100050502)
- ACI-HERZOG A JOINT VENTURE, Guaynabo: PRR05J014, minor, term to 2026-02-28
- ALAMEDA TOWERS I & II, San Juan: PRR1000KS, minor, term to 2027-02-16
- ALAMEDA TOWERS I Y II, San Juan: PRR1000KM, minor, term to 2027-02-16
- BETTER ROADS ASPHALT CORP, Rio Piedras: PR0021202, major, term to 2005-06-30
- CASA METROPOLITANA 2, San Juan: PRR1000IJ, minor, term to 2027-02-16
- CASA METROPOLITANA II, San Juan: PRR1000IR, minor, term to 2027-02-16
- CENTRO COMPRENSIVO DE CANCER - ESTACIONAMIENTO, San Juan: PRR1000FP, minor, term to 2027-02-16
- CENTRO MEDICO COMPLEX, San Juan: PRR040087
- COMPREHENSIVE MODERNIZATION ALTURAS DE CUPEY, San Juan: PRR1000LE, minor, term to 2027-02-16
- CPT EURIPIDES RUBIO, JR. ARC, Puerto Nueve: PRNOEJ026, minor, term to 2028-02-14
What stands out
- Its term runs 4 years and 262 days, May 29, 2017 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 1,076 discharge permits on the register in Puerto Rico; 418 of them (39%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL |
|---|---|
| Permittee | Del Valle Group, SP |
| NPDES ID | PRR100014 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 29, 2017 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | San Juan, PR 00920 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Rio Puerto Nuevo at mouth (HUC 210100050502) |
NPDES PRR100014: effluent limits and exceedances
CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL (NPDES PRR100014): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES PRR100014: no pollutant row on file.
NPDES PRR100014: inspections, violations and enforcement
NPDES PRR100014 (CONTRACT 2D WALLS CONSTRUCTION PROJECT - PUERTO NUEVO RIVER FLOOD CONTROL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES PRR100014
NPDES PRR100014: one email when its EPA record changes — $99/month.
Permits near NPDES PRR100014
NPDES PRR100014: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.