NPDES PRR100053 · Clean Water Act
REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER, Naguabo, PR: NPDES PRR100053 discharge permit, effluent exceedances, inspections, penalties
REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER, Naguabo, Puerto Rico: General permit coverage PRR100053, held by Del Valle Group SP; Construction stormwater; Administratively continued; issued October 8, 2018, term to February 15, 2022, by U.S. EPA.
Puerto Rico holds 418 Construction stormwater coverages of this permit type in EPA’s file; 7 were issued before PRR100053.
Coverages issued nearest PRR100053
- 2017-05-30: SABANERA DORADO, Dorado: PRR10001F, held by Hacienda San Martin, Inc.
- 2017-05-30: REPLACEMENT OF BRIDGE NO. 982 OVER PR-189 INT. PR-30 KM. 4.1, GURABO, Gurabo: PRR10001H, held by Constructora Santiago II Corp.
- 2017-06-20: REPLACEMENT OF BRIDGE NO. 178 OVER TOITA CREEK AT PR-14 KM 65.57, CAYEY, Cayey: PRR10002J, held by Tamrio, Inc.
- 2017-06-22: VILLAS DE LA CENTRAL VICTORIA, Juncos: PRR10002S, held by Martex Development, SE
- 2018-09-05: LAS CASONAS RESIDENTIAL DEVELOPMENT, Guaynabo: PRR100052, held by Las Casonas de la Vanda, LLC
- 2019-01-01: PUERTO RICO NATIONAL CEMETERY, Morovis: PRR10005Q, held by Construcciones Jose Carro, S.E.
- 2019-01-02: JOSE GAUTIER BENITEZ REVITALIZATION, Caguas: PRR10005V, held by F&R Construction Group, Inc
- 2019-01-03: DEVELOPMENT OF NINETEEN (19) RESIDENTIAL LOTS, Aguada: PRR10005Y, held by Hammer Contractors Advisor Corp.
- 2019-01-10: MIRADOR DEL SOL, Cabo Rojo: PRR10005T, held by Karimar Construction, Inc.
- 2019-03-21: RIVIERA MULTI-PHASE PLANNED COMMUNITY, Bayamon: PRR10006R, held by VRM 2018,LLC
REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER among its neighbors
5 discharge permits are in the Rio Blanco near mouth subwatershed (HUC 210100050202); PRR100053 is one.
Other permits in the Rio Blanco near mouth subwatershed (HUC 210100050202)
- PR FS-27 SLIDE REPAIR, N/A: PRR1000BO, minor, term to 2022-02-15
- PRASA MAIZALES WTP, Naguabo: PR0026905, minor, term to 2023-01-31
- PRPBA-FERMIN DELGADO-DIAZ SCHO, Naguabo: PR0026107
- RÍO BLANCO OFFSHORE RESERVOIR, Naguabo: PRR10B669
Identity
| Facility | REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER |
|---|---|
| Permittee | Del Valle Group SP |
| NPDES ID | PRR100053 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 8, 2018 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Naguabo, PR 00718 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Rio Blanco near mouth (HUC 210100050202) |
NPDES PRR100053: effluent limits and exceedances
REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER (NPDES PRR100053): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES PRR100053: no pollutant row on file.
NPDES PRR100053: inspections, violations and enforcement
NPDES PRR100053 (REPLACEMENT OF BRIDGE NO. 194 OVER RIO BLANCO RIVER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES PRR100053
NPDES PRR100053: one email when its EPA record changes — $99/month.
Permits near NPDES PRR100053
NPDES PRR100053: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.